BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2024 at 8:00 PM

Updated May 7, 2024

Site work and paving for a mixed-use development in Port Saint Lucie, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of May 6, 2024, this project has not yet been awarded. A timeline for the award has not yet been established.** Scope of Work The City seeks a consultant to provide field survey, design, and permitting services for complete street and mobility improvements to NW Bayshore Boulevard between Prima Vista Boulevard and NW Selvitz Road. Proposed improvements may include, but are not limited to, the following Full Depth Reclamation (FDR) and widening of approximately 6,100 LF of existing roadway. Construction of a Roundabout at NW Bayshore Blvd. and NW Floresta Dr. Construction of approximately 6,700 LF of 8 wide concrete sidewalk on the west side of NW Bayshore Boulevard from Prima Vista Blvd. to NW Selvitz Rd. Construction of pedestrian crossings and connections at the NW Selvitz Rd. Roundabout. The City of Port St. Lucie reserves the right to reject any and all proposals, to waive any and all informalities or irregularities, to negotiate with any qualified Proposers, and to accept or reject allor any part of any proposal as it may deem to be in the best interest of the citizens of the City. The City seeks a consultant to provide field survey, design, and permitting services for complete street and mobility improvements to NW Bayshore Boulevard between Prima Vista Boulevard and NW Selvitz Road. Proposed improvements may include, but are not limited to, the following: Full Depth Reclamation (FDR) and widening of approximately 6,100 LF of existing roadway. o Construction of a Roundabout at NW Bayshore Blvd. and NW Floresta Dr. o Construction of approximately 6,700 LF of 8' wide concrete sidewalk on the west side of NW Bayshore Boulevard from Prima Vista Blvd. to NW Selvitz Rd. o Construction of pedestrian crossings and connections at the NW Selvitz Rd. Roundabout Deadline for written questions sent via email to the Issuing Officer March 18, 2024 3:00 PM Completion-240 days

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

11

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
66
Bidding Soon
1,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

May 13, 2024

Project location map

Multiple Locations, Port Saint Lucie, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.