BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and renovation of a mixed-use development in Bakersfield, California. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; for paving for a road / highway; and road / highway.

Stockdale High School: Portables Electrical. DSA FILE NO.: 15-H3 DSA APP NO.: 03-123069 The Work of Project is defined by the Contract Documents and consists of the sitework associated with the installation of six (6) modular (relocatable) buildings for the Stockdale High School for use as temporary classrooms during ESSER funded and modernization projects, as shown on Contract Documents prepared by IBI Group, dated May 23, 2023, which includes sitework, including the following: Utilities, Selective demolition, Earthwork, Asphalt Paving, Site electrical, Fire alarm. Refer to Project Manual Table of Contents, Specifications Divisions 2 thru 49 for listing of Work included. This project is anticipated to start on approximately May 6, 2024, and will have a duration of twenty (20) calendar days for completion. PROJECT DESCRIPTION: The Work of Project is defined by the Contract Documents and consists of the sitework associated with the installation of six (6) modular (relocatable) buildings for the Stockdale High School for use as temporary classrooms during ESSER funded and modernization projects, as shown on Contract Documents prepared by IBI Group, dated May 23, 2023, which includes sitework, including the following: Utilities, Selective demolition, Earthwork, Asphalt Paving, Site electrical, Fire alarm. Refer to Project Manual Table of Contents, Specifications Divisions 2 thru 49 for listing of Work included. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% PROJECT LOCATION: Stockdale High School 2800 Buena Vista Road Bakersfield, CA 93311. Liquidated Damages $1,000.00 per calendar day. Estimated Bid Value $150,000.00

Award

Educational

$487,900.00

Public - County

Demolition, Paving, Renovation, Site Work

81

19

11

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
476
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

May 6, 2024

img_map_placeholder

2800 Buena Vista Rd, Bakersfield, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.