Site work for a civil project in Stuart, Oklahoma. Completed plans call for site work for a water / sewer project.

Hickory Hills Pump Station 1. Modify existing remote telemetry unit (RTU) to provide data communication from Hickory Hills Standpipe (new) to Hickory Hills Pump Station and Hughes RWD#2 WTP Office. Equipment required for modifications shall be provided by the Integrator. 2. Create a communication subnetwork for the Hickory Hills Standpipe and Pump Station by adding new data radio modems and updating the human machine interface (HMI). 3. HMI shall be integrated with the existing programmable logic controller (PLC) to integrate the new telemetry subnetwork with the existing radio telemetry network. The integration shall provide data communication for the new subsystem to the existing system, including the Hughes RWD#2 office. 4. Pump "run" status conditions shall be indicated for each individual pump. Pump status shall be indicated on the HMI. 5. Pump "fail" status conditions shall be indicated for each individual pump locally. A pump "fail" condition shall be determined if a pump fails to start after a field adjustable time delay once the pump is "called" to run. Pump status shall be indicated on the HMI. Bond Notes: The General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation. A Bid must be accompanied by Bid Security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price (determined by adding the base Bid and all alternates) and in the form of certified check, bank money order, or a Bid Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Owner Rights: Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Without assigning any reason therefore, and to make the awards in the best interest of the Owner, Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work. Bids are solicited and a Contract award will be made pursuant to the Public Competitive Bidding Act of 1974 as amended. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. Liquidity Damages: Provisions for liquidated damages, if any, for failure to timely attain, Substantial Completion, are set forth in the Agreement. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1000 for each day that expires after such time until the Work is completed and ready for final payment.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

15

14

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
41
Bidding Soon
328
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 29, 2024

img_map_placeholder

To Be Determined, Stuart, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.