EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Weatherly, Pennsylvania. Completed plans call for the renovation of a municipal facility.

As of May 6, 2024, the project was awrded to H&P Construction, Inc., with an awarded amount of $22,020.04. Any questions pertaining to the bid documents must be submitted via online "Messages/Vendor Discussions" feature by Wednesday, March 6th, 2024 by 5:00 pm. Answers to the questions will be posted online on online by Thursday, March 7th, before 5:00 pm. Proposals must be submitted in accordance with the Contract Documents. Bid Security in an amount equal to ten percent (10%) of the total bid shall be submitted with each bid in accordance with the instruction to bidders. Performance and payment bonds will be required. Bonding Companies must be listed in the US Treasury Circular 570. The Labor Standards and Anti-Kickback regulations (29 CFR, Part 3) issued by the Secretary of Labor are included in the contract documents of this project and govern all work under the contracts. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project; that a mandatory ration of apprentices and trainees to journeymen is required in each craft and the Contractor (and any subcontractors) is obliged to make a "diligent effort" to achieve these ratios; and that, to the greatest extent feasible, opportunities for training and employment be given to lower income of the project area businesses located in or owned in substantial part by project area residents. Nondiscrimination in employment - bidders on this work will be required to comply with Executive Order 11246 and will be required to insure that employees and applicants for employment are not discriminated against on the basis of their race, color, national origin, sex, religion, age, disability or familial status in employment or the provision of service. In addition to EEO Executive Order 11246, contractors must also establish a 6.9% goal for female participation and a 0.6% goal for minority participation in the aggregate on site construction work force for contracts and subcontracts in excess of $10,000, as per the United States Department of Labor, Office of Federal Contract Compliance Programs. Attention is called to Section 3 of the Housing and Urban Development Act of 1968, 12 USC 179 LV and the Section 3 clause and regulations set forth in 24 CFR Part 135. In compliance with Executive Order 11625 and 12138, the successful bidder must utilize to the greatest extent feasible, minority and/or women-owned businesses located in the municipality, county or general trade areas. The Owner reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by the owner for a period not to exceed thirty-five (35) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding of the contract. In this period of time, no bidder may withdraw their bid.

Award

Municipal

$22,020.00

Public - County

Renovation

6

17

4

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Membrane Roofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
127
Bidding Soon
1,890
All Active Projects
890
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

img_map_placeholder

260 Maple St, Weatherly, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

260 Maple Street Weatherly, PA Roof Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.