EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Grand Rapids, Michigan. Completed plans call for site work for a water / sewer project.

Improvements To The Filter Programmable Logic Controller At The Lake Michigan Filtration Plant. This work consists of replacement of the Filter Cell PLC's at the LMFP. Bidders and subcontractors must comply with the City of Grand Rapids prequalification and certification requirements. The successful bidder for the above project may not discriminate against any employee or job applicant in any matter related to employment because of actual or perceived color, race, religion or creed, sex, gender identity or expression, sexual orientation, national origin, genotype, age, marital status, familial status, medical condition, disability, height, weight, or source of lawful income and the successful bidder will be required to insert that provision in all subcontracts relating to the project. The successful bidder will be required to have a policy regarding Drug Free Workplace and certify to the City that this policy is in place. A certified check or bid bond for a sum not less than five percent (5%) of the amount of the Bid will be required with each bid. No bid may be withdrawn for a period of 45 calendar days after the date and time for receiving bids. The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] or conditional Bids; or to advertise for new Bids. The City also reserves the right to award the Contract in the City's best interest, and therefore, may select a Bidder other than the lowest. Question Deadline 03/26/2024

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

18

10

6

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
56
Bidding Soon
715
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

June 4, 2024

img_map_placeholder

17350 Lake Michigan Dr, Grand Rapids, MI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Improvements To The Filter Programmable Logic Controller At The Lake Michigan Filtration Plant

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.