Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 13, 2024 at 8:00 PM
Updated June 28, 2024
Site work for a civil project in Duncan, Oklahoma. Completed plans call for site work for a water / sewer project.
El Rancho 1.0 MG Elevated Storage Tank. Description of Work: Construction of a new 1.0 million gallons composite elevated storage tank, including all electrical, piping, valves, ladders, foundation, SCADA equipment, instrumentation, site work, and necessary appurtenances. Demolition of an existing 2.0 million gallon steel storage tank, underground piping, foundation, valves, and miscellaneous concrete structures. Shutdowns of existing facilities 1. Connection to existing 12" waterline 2. Connection to existing 6" waterline Estimate: $7,100,000.00. Final completion- 640 days Question Deadline 03/28/2024 at 1:30 PM CT The deadline to ask questions. The deadline to ask questions. Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data to the Construction Manager using the procurement website Please direct all questions related to the design of this Project to the Q&A Section. A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation, and all other Work required for a complete and operable Project. 4. Test and place the completed Project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as indicated in the Contract Documents for the operation and maintenance of the Project. 6. The Contract Documents do not indicate or describe all Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Construction Manager.
Bid Results
Water / Sewer
$6,139,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2024
June 10, 2024
3914 El Rancho Dr, Duncan, OK
Related To This Project
Duncan, OK
Bid Date: Apr 03 2024
Duncan, OK
Bid Date: Apr 18 2024
Duncan, OK
Bid Date: Apr 25 2024
Duncan, OK
Bid Date: May 01 2024
Duncan, OK
Bid Date: May 21 2024
Duncan, OK
Bid Date: May 21 2024
Duncan, OK
Bid Date: May 21 2024
Duncan, OK
Bid Date: May 21 2024
Duncan, OK
--
Duncan, OK
--
Duncan, OK
--
Duncan, OK
Bid Date: Feb 21 2024
Duncan, OK
Bid Date: Apr 10 2025
Duncan, OK
--
Duncan, OK
Bid Date: Feb 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.