BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a sidewalk / parking lot in Winston Salem, North Carolina. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Brewer Road Sidewalk (BL-0018) project will provide civil and roadway design services for a continuous 5 wide sidewalk, a 3.5 grass utility strip, and standard 2.5 curb and gutter on the west side of the approximately 0.75-mile section of Brewer Road between West Clemmonsville Road and Buchanan Street. The project will also include civil design services for an approximately 375 section of 6 sidewalk and ADA accommodations on the north side of Brewer Rd on the back of existing curb in front of Parkland High School between the school driveways. The project will also include installation of crosswalks on the south and west legs of the roundabout at Buchanan Street. The project deliverables must also include utility-make-ready and traffic control plans to facilitate the construction of the proposed sidewalk. The project is expected to provide connectivity to existing sidewalk infrastructure in place within the project limits and provide safer conditions for the students and staff of Parkland High School. All questions concerning this RFQ/LOI or the scope of work should be submitted in writing to Will Cave at williamgc@cityofws.org by the End of Question period of 5:00pm, March 4, 2025. This RFLOI is to solicit responses from qualified firms to provide professional consulting services to design the Brewer Road sidewalk in Winston-Salem, North Carolina along Brewer Road from Buchanan Street to W Clemmonsville Road and along the front of Parkland High School. From Notice To Proceed until project completion, anticipated completion time of 8 months . Anticipated firm selection and notification will be early March 2025. Anticipated Notice to Proceed shall be mid-July 2025. : Lump Sum; Not to Exceed negotiated price, to be invoiced no more than once every 30 days NCDOT - RFP Engineering - Brewer Road Sidewalk

Conceptual

Sidewalks / Parking Lot

$2,326,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
135
Bidding Soon
1,644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2027

Project location map

Brewer Rd, Winston Salem, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.