Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 8, 2024 at 8:00 PM
Updated April 9, 2024
Renovation of a museum in Taylor, Michigan. Completed plans call for the renovation of a museum.
Reference Number 0000347606 Project Location: Taylor Veteran's Museum - 23511 Goddard Rd. Taylor, MI 48180 CUSTOM BUILT CABINETRY SPECIFICATION: oCabinet backs will be 3/4" PSRO (plain sliced red oak) veneer core plywood stapled and screwed to the cabinet sides, top and bottom. oCabinet sides, mid shelf along with tops and bottoms shall be 3/4" PSRO veneer plywood. oSolid 3/4" red oak frame only doors held with blind screw fasteners and oak strap reinforced joints. Doors to receive 1/4" clear tempered glass. oCabinet interiors and doors shall be finished with clear lacquer. oAll cabinet door hardware to be concealed and self-closing hinges. oEach door shall have a single keyed alike cam lock. oThe display units will be placed on a continuous plywood riser finished with 3 3/4" red oak ogee base, stained to match the existing as close as possible. oBetween each display unit a red oak fluted 3 1/4" x 3/4" pilaster will be installed proud. Stain to match the existing as close as possible. oTop the display units with 3 1/4" red oak crown following the line of cabinetry and pilasters. Stain to match the existing as close as possible. oThis project will require 11 Display cases. Approximate size to be 40" x 20" x 83" when complete. CUSTOM BUILT PURPLE HEART BOOKCASE SPECIFICATION: oBookcase backs will be 3/4 PSRO (plain sliced red oak) veneer core plywood stapled and screwed to the cabinet sides, top and bottom. oBookcase sides, shelves, tops and bottoms shall be 3/4" PSRO veneer plywood. oBookcase interiors and shelves shall be finished with clear lacquer. oThe case units will be placed on a continuous plywood riser finished with 3 1/4" red oak ogee base, stained to match the existing as close as possible. oAccenting the ends and in the middle of the largest unit a red oak fluted 3 Vs "x 3/3" pilaster will be installed proud. The top of each pilaster will be adorned with a field of white surrounding a red star and underscored by (2) red bars. Stain to match the existing as close as possible. oProvide and install granite tops on the three-tiered bookcase design. Refer to the provided drawings. Color to be "Steal Grey" with a waterfall edge. MISCELLANEOUS: oComplete ends of existing units as necessary. oInstall stored unit as directed by owner at adjacent cabinet as seamless as possible. Award Requirements - All or None Award
Bid Results
Museum
$19,500.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2024
May 3, 2024
23511 Goddard Rd, Taylor, MI
Related To This Project
Taylor, MI
Bid Date: Mar 27 2024
Taylor, MI
Bid Date: Apr 24 2024
Taylor, MI
Bid Date: Apr 29 2024
Taylor, MI
Bid Date: Oct 08 2018
Taylor, MI
Bid Date: Apr 23 2024
Taylor, MI
Bid Date: Apr 25 2024
Taylor, MI
Bid Date: Apr 23 2024
Taylor, MI
Bid Date: Apr 29 2024
Taylor, MI
Bid Date: Apr 04 2024
Taylor, MI
Bid Date: Mar 12 2024
Taylor, MI
Bid Date: May 02 2024
Taylor, MI
Bid Date: Feb 27 2024
Taylor, MI
Bid Date: Feb 20 2024
Taylor, MI
Bid Date: Feb 20 2024
Taylor, MI
Bid Date: Feb 20 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed