BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2025 at 7:00 PM

Updated January 4, 2025

Site work and paving for a road / highway in Independence, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

***Awarded bidder from previous bid opening: Pavement Management LLC The City of Independence is soliciting bids from qualified bidders for the Pavement Maintenance Crack Filling Operations Project for the Municipal Services Department. The project provides for asphalt pavement maintenance, including all necessary preparation work, at various location throughout the City. Deadline for questions is 5:00 p.m. local time on Wednesday, March 13, 2024 Please submit all questions regarding this Invitation to Bid online via Electronically. A. The contractor shall provide, as stipulated in this ITB, a payment, performance, and maintenance bond for faithful performance of the contract and for persons performing labor or furnishing materials in connection therewith, with sureties satisfactory to the City and in the form provided. This bond shall be in the full amount of the contract and shall have as surety thereon a company authorized to do business in the State of Missouri, qualified as acceptable surety for United States government deposits, and acceptable to the City. B. The contractor will guarantee that the equipment, materials and workmanship furnished under the contract will be as specified and will be free from defect for a period of two years from the date of final City acceptance. In addition, the equipment or materials furnished by the contractor shall, upon receipt of notice from the City, be repaired or replaced without expense to the City, and the contractor shall save the City harmless from any damage from faulty workmanship or materials installed under the contract. THE UNDERSIGNED HEREBY AGREES to furnish the required bond and to enter into contract agreement within ten (10) days after acceptance of this Proposal; and, FURTHER AGREES TO COMPLETE all work covered by this Proposal in accordance with the stipulated conditions and requirements within sixty (60) working days, for the amount of the total construction cost shown and accepted. ENCLOSED is bidder's bond or certified check in the amount of five percent (5%) of the total cost of the construction shown in the Proposal. Contractor is responsible for obtaining all permits that are needed for all work that is to be performed in the MoDOT ROW. This includes pavement, concrete, any traffic signal work, and restoration. Questions regarding the bid process shall be submitted via www.publicpurchase.com. The City will respond to questions via www.publicpurchase.com.thus providing all questions and answers to all prospective bidders equally. The contract provides for, but is not limited to, crack filling, traffic control and all appurtenant work for the completion ofthe project as specified in the Contract Documents including all necessary equipment, labor, materials, and supplies required. This project provides for but is not limited to asphalt street pavement crack treatment at various locations throughout the City as shown on the maps and exhibits, and as designated for the Pavement Maintenance Crack Filling Operations Project (Project Number 112201-9) The contract provides for, but is not limited to, crack filling, traffic control and all appurtenant work for the completion ofthe project as specified in the Contract Documents including all necessary equipment, labor, materials, and supplies required.

Post-Bid

Roads / Highways

$80,000.00

Public - City

Paving, Site Work

14

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
75
Bidding Soon
1,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 20, 2025

Project location map

Multiple Locations, Independence, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.