Site work and paving for a road / highway in Winston Salem, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This RFLOI is to solicit responses (LETTERS of INTEREST, or LOIs) from qualified firms to provide professional consulting services to design the extension of Piedmont Regional Greenway in Winston-Salem, North Carolina along Kerners Mill Creek from Linville Road to Hastings Hill Road. Summary: In 2013, the City of Winston-Salem entered into an agreement with NCDOT for the acceptance of STP-DA funding for the construction of 6,500 linear feet of greenway along Kerners Mill Creek from Linville Road to Hastings Hill Road, including a pedestrian culvert under Hastings Hill Road and boardwalks. Some preliminary environmental and flood studies have been performed. This work will include but not limited to hydraulic design, location surveys, erosion control plans and permitting, preparation of construction contract proposal and estimates, and utility coordination. All applicants should be familiar with these processes and provide examples in Section III - "Project Understanding and Similar Projects". This project is approximately at 50% design completion. The selected firm will need to take the existing design and complete drainage, erosion control, erosion control permit; and finalize plans, quantities, and contract special provisions per Federal/NCDOT standards. The construction contractor will provide culvert and pedestrian boardwalk plans. Piedmont Regional Greenway is being partially funded with Federal Funds which pass through the North Carolina Department of Transportation (NCDOT). Experience and thorough understanding of the FHWA and NCDOT requirements is essential. This project must adhere to all Federal and State of North Carolina standards. All technical or other questions concerning this request for Letters of Interest should be submitted in writing only by 5:00 PM, August 20, 2024 to Wes Kimbrell at: wesleyki@cityofws.org. The firm must have the financial ability to undertake the work and assume the liability. The selected firm(s) will be required to furnish proof of Professional Liability insurance coverage in the minimum amount of $1,000,000.00. The firm(s) must have an adequate accounting system to identify costs chargeable to the project. SCOPE OF WORK The City of Winston-Salem is soliciting proposals for the services of a firm/team for the following contract scope of work: 1. Designing approximately 6,500 linear feet of greenway along Kerners Mill Creek from Linville Road to Hastings Hill Road. 2. This work will include, but not limited to, hydraulic design, location surveys, construction plans, and erosion control plans and permitting, and utility coordination. 3. Provide special contract provisions. 4. Preparation of construction plans, including Engineer's Opinion of Probable Cost with proposed quantities and unit costs. PROPOSED CONTRACT TIME: From Notice To Proceed until project completion, anticipated completion date of December 31, 2025. PROPOSED CONTRACT PAYMENT TYPE: Proposed Contract Payment Type - i.e. LUMP SUM; NOT TO EXCEED negotiated price, to be invoiced no more than once every 30 days.

Conceptual

Roads / Highways

$900,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
106
Bidding Soon
1,628
All Active Projects
720
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 27, 2025

December 31, 2025

img_map_placeholder

Mill Creek Rd, Winston Salem, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.