BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Union Beach, New Jersey. Working plans call for site work for a water / sewer project.

THIS IS A PROJECT LABOR AGREEMENT (PLA) NOTICE TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW UP INFORMATION REQUESTS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME; HOWEVER RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. NO RESPONSES TO THIS PLA NOTICE WILL BE POSTED TO SAM.GOV. The purpose of this announcement is to gain knowledge of the use and benefits of Project Labor Agreements (PLAs) Port Monmouth Hurricane and Storm Damage Reduction Project in Middletown Township, Monmouth County, New Jersey. The NAICS Code is 237990 (Other Heavy and Civil Engineering Construction). Any potential competitive solicitation(s) that may proceed from this notice will be posted to SAM.gov. All interested offerors will have the opportunity to respond to a solicitation announcement at a later time if and when a solicitation is issued. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for construction of the Phase II, Contract 4B components of the Port Monmouth Hurricane and Storm Damage Reduction Project in Middletown Township, Monmouth County, New Jersey The Port Monmouth project includes shore protection components (phase 1) as well as flood risk management components (phase II).; The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consists of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. . For this PLA: Only Contract 4B construction contracts is considered. Contract 4B - 1,521 LF Floodwall, 1040 Levee, 3,100 Contaminated non-hazardous material, 15,510 CY Haul and Dispose of excess/unsatisfactory material, 2,405 CY Borrow Material, 2 Road Closure gates, 119,300 LF Steel H-Piles, 11 total static load tests for primary and secondary test piles The magnitude of the Contract 4B project is between $50 million and $75 million. Duration of construction will be approximately 1,300 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in June 2024. PLA DEFINITION A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY (a) Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. (b) When awarding a contract in connection with a large-scale construction project (see 22.502), agencies shall require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.504(d) applies. (c) An agency may require the use of a project labor agreement on projects where the total cost to the Federal Government is less than that for a large-scale construction project, if appropriate. (1) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will-- (i) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (ii) Be consistent with law. (2) Agencies may consider the following factors in deciding whether the use of a project labor agreement is appropriate for a construction project where the total cost to the Federal Government is less than that for a large-scale construction project: (i) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. (ii) There is a shortage of skilled labor in the region in which the construction project will be sited. (iii) Completion of the project will require an extended period of time. (iv) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. (v) A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs. (vi) Any other factors that the agency decides are appropriate. PLA COMMENT SOLICITATION In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: Have comparable projects been undertaken by Federal, State, municipal, or private entities in the geographic area of this project Do you have knowledge that a PLA has been used in the local area on similar projects If so, please provide supporting documentation For each project, please indicate if a PLA was used, if available, the initial and final cost, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade Are there concerns by prime contractors on the availability of skilled construction labor Are there large scale construction projects in the area (over $15M, within 50 miles of Port Monmouth, New Jersey) which could impact availability of skilled labor for this project What is the anticipated volatility in the labor market for the trades required for the execution of the project Are existing apprentice programs providing sufficient numbers of skilled workers for future requirements If so please elaborate and provide supporting documentation where possible. Are you aware of time sensitive issues/scheduling requirements that would impact the rate at which the referenced project should be completed If so, please elaborate and provide supporting documentation where possible. Is the proposed schedule/completion time one which would benefit from a PLA - if so, how Will a PLA impact the completion time How would a PLA benefit a project which contains a unique and compelling mission-critical schedule Identify specific reasons why or how you believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in federal procurement. Are there any other economies or efficiencies derived by the Federal Government, if using a PLA Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. Are there any concerns regarding labor-management stability related to this project Will the use of a PLA produce labor-management stability on this project Have labor disputes or other labor issues contributed to project delays in the local area Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve What market share does union labor in construction trades have in the geographic area Which existing Collective Bargaining Agreements will expire during construction of this project Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project Are there instances where these standards have not been met on Federal contracts in the local area Were PLAs used for those specific contracts What is the estimated relative cost impact of using a PLA Will a PLA impact the cost of submitting an offer Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals Should a PLA be executed on the above referenced project What benefits do you believe a PLA could achieve What other factors should the Corps consider before deciding to include PLA provisions for the construction/rehabilitation of the Seawall system Montauk Point Lighthouse construction project Please identify any additional information you believe should be considered on the use of a PLA on the referenced project. Please identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. The Government should not construe this PLA Notice as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Information gathered from this research will be used to determine whether a waiver is warranted. Please submit written comments by mail or email to: Attn: Mohenda Surage, CENAN-CT, US Army Corps of Engineers, NY District, 26 Federal Plaza, New York, NY, 10278 Email: Mohenda.r.surage@usace.army.mil Survey Questionnaires will not be accepted after 4:00 pm on the response date shown in the advertisement on SAM.gov. If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will moved to the next business day.

Final Planning

Water / Sewer

$70,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
921
Active Projects
486
Bidding Soon
7,215
All Active Projects
2,979
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 14, 2024

December 6, 2027

img_map_placeholder

Multiple Locations, Union Beach, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.