Renovation of a power facility in Aishihik, Yukon Territory. Completed plans call for the renovation of a power facility.

In 2024, YEC will be performing a major overhaul on the AH3 Hydro Unit. A stamped scope of work is included in Appendix 6. This scope of work presented in Appendix 6 outlines desired outcomes of the overhaul as well as general and technical requirements of the site contractor for supplying specialized work, materials and documentation leading up to the site work and during the site work and project closeout stages. The Aishihik Generating Station is located approximately 145 km west of Whitehorse. The power plant is installed approximately 356ft underground and is accessed by a service elevator and crane shaft through a service building on the surface. The station has three Francis hydro turbines generators, AH1, AH2, AH3. AH1 and AH2 are 15 MW vertical units and were originally installed in the 1970s and they have both been fully overhauled over the last two years. AH3 is a horizontal Francis turbine-generator originally installed in 2010. AH3 operates under a rated head of 180.44 m and spins at 900 rpm. The turbine is rated at 7180 kW and the generator has a 8250 kVA rating at 0.85 PF with a 13.8 kV output. The generator has a PMG and brushless exciter with a silicon rectifier. To date, no major overhauls have been performed on the AH3 unit since original commissioning. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Questions and Queries Deadline March 29, 2024

Post-Bid

Power Plant

$250,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 20, 2024

img_map_placeholder

Aishihik Hydro Plant, Aishihik, YT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.