BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 31, 2025 at 7:00 PM

Updated January 1, 2026

Site work for a mixed-use development in Ann Arbor, Michigan. Working plans call for site work for a medical facility.

Contractor shall furnish all necessary labor, tools, materials, equipment, and supervision as specified in the drawings and specifications to complete site preparation for Nuclear Medicine Rooms D758 and D759 at the Ann Arbor VA Medical Center. The work includes reconfiguring Nuclear Medicine clinical spaces, including walls, floors, utilities, and support elements/systems, to create supporting patient uptake rooms and ensure compliance with physical security requirements. All work must be performed without disruption to Medical Center operations during normal working hours, Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays. Authorization for work outside normal hours must be requested in advance for evaluation and approval. Location: Ann Arbor VA Medical Center, 2215 Fuller Road, Ann Arbor, MI 48105. Magnitude of cost for this project is between $1,000,000.00 and $2,000,000.00. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Medical

$2,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
512
Active Projects
299
Bidding Soon
2,600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

Project location map

2215 Fuller Rd, Ann Arbor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.