Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Virginia Beach, Virginia. Completed plans call for the renovation of a military facility.
This Statement of Work outlines the scope of the renovation project for Building 253 of the Commonwealth Challenge Youth Academy. The project involves addressing structural issues, replacing flooring, and performing various improvements in the specified areas. This contract will be awarded on a Grand Total basis and is a Small-vendor set-aside. This does not guarantee micro vendor's any additional consideration beyond what is required per APSPM Project Scope of Work: 1.Content Removal and Storage: - Empty the foyer entrance area of its contents. - Safely store removed items on-site in designated areas within the building. 2. Containment and Protection: - Block off the hallway leading out of the foyer with plastic barriers to minimize the spread of dust and debris during demolition. 3. Demolition and Investigation: - Demolish the existing floor in the foyer down to the structural framing to identify the cause of the current structural problem. 4. Structural Repair: - Replace all damaged floor joists in the foyer as necessary. - Install a new girder supported by cinder block piers and foundations where required. - Install wood blocking as needed for structural stability. 5. Termite Extermination: - Engage a licensed exterminator to treat the area under the building(subterranean) for existing termite infestations. 6. Subfloor and Flooring Installation: - Install a new plywood subfloor in the affected area after the structural repairs are completed. - Prepare the subfloor and proceed to install new Vinyl Composition Tile (VCT) flooring in the foyer at the front, side, and back entrances. - Install new carpet squares in the renovated area. 7. Carpet Replacement: - Remove existing carpet squares and cove base from the lower deck entirely. - Install new carpet squares in all areas that are not covered with VCT with a new cove base (heavy duty rubber). 8. Stairwell Enhancement: - Install new rubber treads on the stairwell leading to the upper level for improved safety. (Heavy duty /rubber) 9. Interior Finishing: - Paint all walls and trim on the lower deck and in the interior stairwell. 10. Occupant Accessibility: - Ensure the safety and accessibility of building occupants throughout the construction process. - Provide alternative entries and exits for occupants as the work progresses. 11. Scope Extension: - The scope of structural work is initially limited to an approximate 20 feet by 20 feet area in the foyer. - If additional structural issues are discovered that require further work, an additional estimate will be provided before proceeding. 12. Manipulation and Adaptation: - Make necessary adjustments or adaptations during the construction process to accommodate unforeseen challenges while maintaining project goals. MANDATORY PREBID/PREPROPOSAL CONFERENCE: A mandatory Prebid conference will be at 10:00 A.M. Monday 19th of March, 2024 at BLDG 253 C Street, SMR, VA Beach, Va 23451 The project will be required to start within 5 business days after award. Project MUST be completed and fully invoiced No Later Than June 5th, 2024. The Agency has as funding requirement to have this project completed by this date. Extension will not be entertained. Commonwealth ChalleNGe Youth Academy is a SMOKE FREE & DRUG FREE campus. Please direct all questions to Contracting Officer Jason Bragg.
Award
Military
$53,943.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 22, 2024
April 22, 2024
253 C St, Virginia Beach, VA
Related To This Project
Virginia Beach, VA
Bid Date: Apr 16 2024
Virginia Beach, VA
Bid Date: Apr 15 2024
Virginia Beach, VA
Bid Date: Mar 29 2024
Virginia Beach, VA
Bid Date: Apr 15 2024
Virginia Beach, VA
Bid Date: Apr 29 2024
Virginia Beach, VA
Bid Date: May 09 2024
Virginia Beach, VA
Bid Date: May 03 2024
Virginia Beach, VA
Bid Date: Mar 22 2024
Virginia Beach, VA
Bid Date: Apr 15 2024
Virginia Beach, VA
Bid Date: Mar 27 2024
Virginia Beach, VA
Bid Date: May 01 2024
Virginia Beach, VA
Bid Date: Jun 20 2024
Virginia Beach, VA
Bid Date: Apr 18 2024
Virginia Beach, VA
Bid Date: Apr 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--