BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Renovation of a mixed-use development in Fargo, North Dakota. Completed plans call for the renovation of a medical facility.

Notice ID - 36C77624Q0146 THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS JUNE 11, 2025, at 1:00pm CT. The intent of this project is for the following infrastructure improvements: Construct new Data Center addition to include Electrical (electrical panel, lighting, fire alarm, power distribution (normal, emergency, Bonding, UPS,) Mechanical (new HVAC and ductwork, controls, interface with building management), Construction of new space (site work, utilities, physical security, demo, new construction, finishes), relocate fiber infrastructure MDA, install diversified path to datacenter for WAN Project Building locations include: Buildings 1 and site. The Contractor shall completely prepare buildings and campus for operations, including demolition and removal of existing portions of structures, and furnish labor and materials and perform work for Fargo VA VAMC - EHRM Infrastructure Upgrades, Tier 2 construction project. Related Notice 4f034e69b989433aa7628ab65fa08d33 437-21-210 EHRM Infrastructure Upgrades Tier 2, Fargo ND In accordance with 38 U.S.C. 8127 (Public Law 109-461), this project is a competitive Service Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as required by drawings and specifications to complete the necessary work for the EHRM Infrastructure Upgrades Tier 2 project. The location of the project is: FARGO VA Medical Center 2101 Elm St. North Fargo, ND 58102-2417 This project must be completed in accordance with specifications, drawings and supporting attachments included in the solicitation package. The VAAR Construction Magnitude for this project is between $20,000,000 and $50,000,000. Contractor is required to fill in Unique Entity Identifier in Block No. 14 on Standard Form (SF) 1442. All references in the Specs and Drawings to CLIN shall be replaced with the term Line Item. PLEASE NOTE: the Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5. Questions of a technical nature must be provided in writing and must be submitted by the prospective offerors to the Contracting Officer and Contract Specialist. Questions must be submitted only via e-mail to both Katherine Gibney, at katherine.gibney@va.gov, and Emil Reyes, at emil.reyes@va.gov. The subject line must read: FARGO VAMC - EHRM INFRASTRUCTURE UPGRADES TIER TWO - TECHNICAL QUESTIONS. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS JUNE 11, 2025, at 1:00pm CT. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Medical

$13,900,600.00

Public - Federal

Renovation

1

6

38

9

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

October 6, 2025

Project location map

2101 Elm St N, Fargo, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.