Published May 9, 2024 at 8:00 PM
Updated May 10, 2024
Site work, paving and outdoor lighting for a mixed-use development in Kirkland, Quebec. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and sidewalk / parking lot.
Reference number: 1823762 Deadline for receiving complaints: 2024-03-27 Reconfiguration of the Saint-Charles North Interchange. The work to be carried out is the excavation of the existing pavement structure, the construction of a new roadway for the two new ramps, the modification of the existing signage and markings, the installation of new traffic signals and the modification of the lighting network as well as all the related work described in the specification book. 4960 m2 of paving to be scarified to a thickness of 45 mm; 3570 m2 of paving to be removed; Fire hydrant to be moved; 5 catch basins to be installed; 3460 m2 pavement infrastructure preparation; 390 m of cement concrete curb; 470 m of monolithic cement concrete sidewalk; Adjustment of the structure of public utilities; 735 tonnes of GB-20, PG 64E-28 asphalt; 250 tonnes of ESG-14, PG 64E-28 asphalt; 1045 tonnes of ESG-10 asphalt, PG 64E-28; Signage and markings; Dismantling of a signalling superstructure; 6 new traffic lights; Street lighting. Duration of work: 90 calendar days Bid Results :: Batch 01 :: ALI EXCAVATION INC. :: $3,829,109.03 Batch 02 :: ALI EXCAVATION INC. :: $4,224,485.28
Award
Roads / Highways
$3,829,109.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2024
May 3, 2024
Boulevard St Charles, Kirkland, QC
Related To This Project
Kirkland, QC
Bid Date: Apr 15 2024
Kirkland, QC
Bid Date: May 07 2024
Kirkland, QC
Bid Date: May 02 2024
Kirkland, QC
--
Kirkland, QC
Bid Date: May 13 2024
Kirkland, QC
Bid Date: Apr 22 2024
Kirkland, QC
Bid Date: Jun 25 2024
Kirkland, QC
Bid Date: Jun 25 2024
Kirkland, QC
Bid Date: Mar 11 2024
Kirkland, QC
--
Kirkland, QC
Bid Date: Mar 07 2024
Kirkland, QC
Bid Date: Feb 12 2024
Kirkland, QC
Bid Date: Feb 19 2024
Kirkland, QC
Bid Date: Dec 18 2023
Kirkland, QC
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.