Site work and paving for a mixed-use development in Bellevue, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Work Contemplated to Be Performed Under This Contract is as Follows: O Constructing Approximately 13,900 Lf of Ductile Iron Water Mains, O Constructing Approximately 1,300 Lf of Earthquake Resistant Ductile Iron Pipe Water Mains, O Constructing Approximately 1,100 Lf of Hdpe Water Mains, O Installing New Fire Hydrant Assemblies, O Installing Replacement Water Services, O Constructing a Replacement Pressure Reducing Station in a Concrete Vault, O Rehabilitate Existing Pressure Reducing Station, O Construction Dewatering, O Relocating Existing Utilities (as Required), O Abandoning Asbestos Cement Pipe, O Restoring Surface Conditions, Including Asphalt Trench Patching and Concrete Curbs, Gutters, and Sidewalks, O Performing Traffic Control, O Other Work as Required to Complete the Project. Bid Bond Required: Each Bid Shall Be Accompanied by a Bid Bond in the Form of Cash, Certified Check, Cashier's Check or Surety Bond in an Amount Equal to at Least 5% of the Amount of Such Bid. Checks Shall Be Made Payable to the City Treasurer. Should the Successful Bidder Fail to Enter Into a Contract and Furnish a Satisfactory Performance and Payment Bond Within the Time Stated in the Specifications, the Bid Bond Shall Be Forfeited to the City of Bellevue. Supplemental Responsible Bidder Criteria Supplemental Responsible Bidder Criteria Will Apply to This Project, and Are Included in the Special Contract Information Section, Item 17. In a Timely Manner, Bidders May Request, in Writing, That the City Modify the Supplemental Criteria. The City Reserves the Right to Modify or Not Modify the Supplemental Criteria in Its Discretion. The City Shall Issue an Addendum, Prior to the Bid Due Date, Should It Modify the Supplemental Criteria. The City Shall Not Modify the Supplemental Criteria After the Bid Due Date, Therefore, Bidders Are Encouraged to Discuss With the Project Manager Immediately and Before the Bid Due Date the Relevancy of the Supplemental Bidder Criteria. Any Bidder Determined to Be Not Responsible Based on These Supplemental Criteria May Appeal the City's Determination by Providing Additional Information to the City Within Two 2 Business Days Following Receipt of the City's Written Determination That the Bidder Was Determined Not Responsible. The City of Bellevue Reserves the Right to Reject Any and All Bids and to Waive Irregularities and Informalities in the Bidding Process. No Bidder May Withdraw Their Bid for a Period of Ninety (90) Days After the Date and Time Set for the Opening Thereof. The Successful Bidder Must Comply With the City of Bellevue Equal Opportunity Requirements. The City of Bellevue is Committed to a Program of Equal Employment Opportunity Regardless of Race, Color, Creed, Religion, Gender, Age, National Origin, Pregnancy, Genetic Information, Marital Status, Sexual Orientation (Including Gender Identity), or the Presence of Any Sensory, Physical, or Mental Disability. The City of Bellevue's is Also Committed to Complying With Title Vi of the Civil Rights Act of 1964, That Provides "No Person in the United States Shall, on the Ground of Race, Color, or National Origin, Be Excluded From Participation in, Be Denied the Benefits of, or Be Subjected to Discrimination Under Any Program or Activity Receiving Federal Financial Assistance." **Document Notes: Bids Documents and Addenda Will Also Be Posted to the Online . Addenda May Not Be Available or Updated on Any Other Website Other Than Through the Official Plan Holders List. **Bid Open Notes: Bids Will Only Be Opened at a Teleconference on the Date and Hour Stated Below, at Which Time Such Bids Will Be Opened, Publicly Read and Tabulated for Submission to the City Council at a Future Council Meeting. The Engineer's Estimate range is between $8.76M and $10.7M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$10,700,000.00

Public - City

Paving, Site Work

111

7

6

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
83
Bidding Soon
2,254
All Active Projects
692
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 3, 2024

June 3, 2024

March 29, 2025

img_map_placeholder

Multiple Locations, Bellevue, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.