BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a parking garage in Toronto, Ontario. Completed plans call for the renovation of a parking garage.

Without Limiting the Scope of the Contract, the Work Shall Generally Consist of the Following, but Not Necessarily in the Order Outlined Below: .1 the Parking Lots Will Continue Operation for the Duration of Construction. Contractor to Coordinate With Tpa Operations. .2 Make Necessary Provisions for Hoarding/fencing and Enclosing the Construction Work Areas. .3 Take All Necessary Protective Measures to Control Dust and Debris, Including Safety Provisions. .4 This Summary of Work is Intended to Provide Basic Identification of the Work, for the Contractor to Determine Upfront, the Nature of the Work Involved in This Contract. In No Way Shall This Section Be Interpreted as Being a Full Representation of the Work of This Contract. .5 It is the Contractor's Sole Responsibility to Examine the Commercial Documents, Specifications and Drawings Issued to Establish/determine Total Scope of Work. .6 Supply All Labour, Material, Tools, Equipment, Transportation, and Supervision Necessary to Perform Demolition of the Existing Redundant Elements and Elements Being Replaced as Outlined Below. The Toronto Parking Authority is planning to replace emergency generators at the following locations: 1) 37 Queen Street East (Car Park No. 26) 2) 75 Holly Street (Car Park No. 29) 3) 2 Church Street (Car Park No. 43) Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2024/03/28 12:00:00 PM EDT

Post-Bid

Parking Garage

$100,000.00

Public - City

Renovation

111

30

47

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
112
Bidding Soon
2,539
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 17, 2024

img_map_placeholder

Multiple Locations, Toronto, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.