BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Taylor Mill, Kentucky. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of April 25, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** The proposed work is generally described as follows: 1) Providing for the temporary removal of TMTP Pump No. 1, including Pump Can, 2) Provide all technical services to inspect Pump No. 1 and provide a written report summarizing the results of the inspections diagnosing the necessary repairs, 3) Complete Pump No. 1 rehabilitation identified in Technical Specifications Section 3 - Scope of Work, 4) Furnish new Pump Can, and 5) Reinstallation of Pump No. 1 and new Pump Can. The scope of the work shall include providing all facilities, equipment, materials, and labor as required to perform services as specified. The delivery, removal, and installation work is to be completed at the Taylor Mill Treatment Plant at 608 Grand Avenue, Taylor Mill, Kentucky 41015. All deliveries and the Work shall occur between the hours of 7:30am to 3:00pm local time, Monday through Friday. The Work shall begin on or after November 1, 2024 and be completed by January 31st, 2025, unless a different time is agreed to in writing by the Contractor and Owner. The inspection report of the Pump deficiencies, including proposed repairs, must be submitted within 15 days of removal of the Pump from Owner's facility. The Work covered in this section includes furnishing of all labor, materials, and equipment for: 1) temporary removal of the existing Pump and Pump Can, 2) inspection of Pump No. 1 and written report on the deficiencies, 3) pump repair, 4) furnish new pump can, 5) reinstallation of repaired pump and new pump can. All deliveries shall be made to the Taylor Mill Treatment Plant at 608 Grand Avenue, Taylor Mill, Kentucky 41015. All deliveries and the Work shall occur between the hours of 7:30am to 3:00pm local time, Monday through Friday

Award

Water / Sewer

$124,421.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
42
Bidding Soon
1,256
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

img_map_placeholder

608 Grand Ave, Taylor Mill, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.