Site work and renovation of a civil project in Largo, Florida. Conceptual plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
Update:https://www.largo.com/Proposed%20FY25-29%20CIP%20Document%20-%20040124.pdf The 142nd Ave. Interceptor begins at the Public Works facility and runs east along Donegan Rd. to 142nd Ave. Since the Wet Weather pumping system was put into operation, the flow through the upper reaches of the interceptor has been greatly reduced as intended to mitigate sanitary sewer overflows. The lower flows result in an acceleration of sediment buildup in the pipe. This development increased the number of cleanings for the interceptor. The goal of this project would be to construct a new lift station at Public Works and pump the flow past the flat section of the interceptor, to a point where higher flow will prevent sediment buildup. The city will hire an engineering consultant to evaluate the existing system, develop design alternatives, then proceed with a design. The city will realize a savings of approximately $80,000 per year in interceptor cleaning cost but will see an additional operational and maintenance cost of approximately $33,000 for the new lift station. Project is included in City of Largo Fiscal Year 2025-2029 Page no 173 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The 142nd Ave. Interceptor begins at the Public Works facility and runs east along Donegan Rd. to 142nd Ave. Since the Wet Weather pumping system was put into operation, the flow through the upper reaches of the interceptor has been greatly reduced as intended to mitigate sanitary sewer overflows. The lower flows result in an acceleration of sediment buildup in the pipe. This development increased the number of cleanings for the interceptor. The goal of this project would be to construct a new lift station at Public Works and pump the flow past the flat section of the interceptor, to a point where higher flow will prevent sediment buildup. The city will hire an engineering consultant to evaluate the existing system, develop design alternatives, then proceed with a design. The city will realize a savings of approximately $80,000 per year in interceptor cleaning cost but will see an additional operational and maintenance cost of approximately $33,000 for the new lift station. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$8,000,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
142nd Ave N, Largo, FL
Related To This Project
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.