BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a playground / park / athletic field in Clarendon, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

1. Installation, maintenance and removal of erosion and sediment control measures, including but not limited to compost filter sock, compliance with trench excavation procedures, and concrete washout. 2. Maintenance and protection of traffic. 3. Protection of existing trees, surfaces and items to remain. 4. Site clearing and grubbing of vegetation indicated to be removed. 5. Stripping of topsoil and excavation, bedding and backfill of water, sewer and electric utility trenches, including utility warning tape and rock removal. 6. Installation of 6" sanitary sewer main and cleanouts, including boring, excavation, dewatering, bedding, pipe and fitting installation and backfill. 7. Installation of 4" sanitary sewer laterals, including boring, excavation, dewatering, bedding, pipe and fitting installation, backfill and campsite sewer drop. 8. Installation of sanitary sewer cleanouts, including excavation, dewatering, bedding, pipe and fitting installation, cleanout cap, frame and cover and backfill. 9. Installation of 4" DIP and 4", 2 1/2" and 3/4 " HDPE water piping, including boring, excavation, dewatering, bedding, pipe and fitting installation, and backfill. 10. Installation of non-freeze sanitary yard hydrants. 11. Installation of gate valves, curb stops & curb boxes. 12. Installation of packaged booster skid and enclosure, including concrete pad. SDB Participation Goal: 6 % VBE Participation Goal: 3 % Engineer's Estimate: $ 1 million - 1.5 million Bond Percentage 10.00% Question Deadline 04/01/2024 at 4:30 PM ET All questions must be received through the Bid Express Service. Questions asked via email, phone, or otherwise will not be answered. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of Five Hundred dollars ($500.00) per day for each and every calendar day thereafter until the work shall be completed and accepted Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within Two Hundred Seventy (270) calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$1,302,700.00

Public - State/Provincial

Paving, Site Work

28

17

3

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
78
Bidding Soon
858
All Active Projects
356
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2024

June 11, 2024

img_map_placeholder

4790 Chapman Dam Rd, Clarendon, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.