BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Clarendon, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

1. Coordination with, and payment of, Electric Utility service fees. 2. Installation of PVC conduit for primary and secondary electrical services in trenches excavated and backfilled by others, including polymer concrete inground junction boxes. 3. Installation of new Utility transformer base. 4. Installation of RV electrical pedestals. 5. Construction of one (1) electrical kiosk including excavation, foundations, structural supports, roof system, exterior coatings, meter base, distribution panelboard, service grounding and convenience lighting/GFI receptacle. 6. Installation of secondary, feeder, branch and grounding conductors as indicated. 7. Electrical appurtenances as specified herein and as indicated on the Contract Drawings, including installation of the booster skid and water treatment control panels. 8. Upgrades to existing Water Treatment Building electrical service from upgraded Utility transformer, including underground conduit, conductors, manual transfer switch, meter base and final connections. 9. Replacement of existing water treatment main distribution panel, service disconnect and treatment control panel, including conduit, junction boxes, conductors and final connections. 10. Furnish and install remote monitoring equipment and instrumentation including automatic telephone dialers and level control equipment at the Water Treatment Building and the Water Tank. 11. Final electrical connections to all equipment and enclosures. DGS Small Business Certification Required Engineer's Estimate: $350,000 - 450,000 Bond Percentage 10.00% Question Deadline 04/01/2024 at 4:30 PM ET All questions must be received through the Bid Express Service. Questions asked via email, phone, or otherwise will not be answered. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of Five Hundred Dollars ($500) per day for each and every calendar day thereafter until the work shall be completed and accepted. Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within Two Hundred Seventy (270) calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$312,910.00

Public - State/Provincial

Site Work

28

16

2

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
78
Bidding Soon
858
All Active Projects
356
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2024

May 13, 2024

img_map_placeholder

4790 Chapman Dam Rd, Clarendon, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.