EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Chattanooga, Tennessee. Completed plans call for site work for a water / sewer project.

Pipeline Rehabilitation for Signal Mountain Infrastructure Improvements - Phase 1 Will Involve Trenchless Cured-in-place Pipe Rehabilitation for Gravity Sewer With Diameters Between 6-inch and 15-inch With an Approximate Total Linear Footage of 33,300.approximately 209 Laterals Will Also Be Rehabilitated Using Trenchless Pipe Methods . Approximately 110 Manholes Will Be Rehabilitated Using Either Polyurethane/polyurea or Epoxy Coating Methods. Approximately 51 Manholes Will Receive a New Watertight Frame and Covered Approximately 47 Manholes Will Receive a New Standard Frame and Cover. In Addition, Approximately 11 External Point Repairs, 3 Spot Repairs of Cipp Liner and 10lateral Seal Connection Liner Installations May Be Required. Further, Approximately8,900 Lf of Gravity Sewer Will Be Cctv'd to Be Evaluated by the Engineer to Issue a Design Directive. Pre-installation Cleaning, Pre- and Post-installation Cctv, Service Lateral Reinstatements, Cleanout Installations and Raising Cleanouts to Grade, Removal and Replacement of Existing Asphalt Pavement Associated With Said Gravity Sewer Rehabilitation and the Removal of Protruding Laterals as Show on the Drawings and as Specified ,is Included. This Project is Being Supported With Arp Treasury, Coronavirus State and Local Recovery Fund Grant Funding. A Bid Bond or Certified Check for Five Percent (5%) of the Total Bid Amount Must Accompany Each Bid. Question Deadline 04/09/2024 No interpretation of the meaning of the bid documents will be made to any bidder orally. Every request for such interpretation shall be in writing addressed to Jacobs Engineering at neeley.langham@jacobs.com. Any questions concerning the bid documents must be received The Successful Bidder Will Be Required to Furnish Acceptable Performance and Payment Bonds in the Amount of One Hundred Percent (100%) of the Contract Price, for Each Bond. The Owner Reserves the Right to Waive Any Irregularity or Reject Any or All Bids. Hamilton County Disadvantaged Business Enterprise(Dbe) Procedures Will Be Part of the Bid Evaluation. Any Bidder Unfamiliar With This Policy Should Contact the Dbe Liaison at(423) 209-6146 Therefore, Certain Restrictions and Other Federal Requirements Attach to This Opportunity. Bids Will Be Received for a Single Prime Contract. The Successful Bidder Will Be Required to Furnish a Performance Bond in the Amount of His Bid and Shall, Before Entering on the Work of Said Contract, Be Licensed as a Contractor of the Wwta. The Owner Reserves the Right to Waive Any Informalities or to Reject Any or All Bids. No Bid May Be Withdrawn Within 120 Days After the Scheduled Time for Receipt of Bids

Post-Bid

Water / Sewer

$88,000.00

Public - County

Site Work

48

15

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
59
Bidding Soon
968
All Active Projects
446
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

img_map_placeholder

Multiple Locations, Chattanooga, TN

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Signal Mountain Infrastructure Improvements - Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.