BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a road / highway in Sunnyvale, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

As of May 14, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Collins Road Phase 1 Landscape, Hardscape, and Irrigation Improvements. Employees are prohibited from taking retaliatory action against you for failing to comply with any request unless the request is within the scope of the employees official duties for the Town. In addition to the electronic proposal/bid form and documentation supporting the selection criteria outlined in SP-3 of the Contract Documents, Proposers must submit, with their Proposal, a Cashier's check, Certified check or a Bid Bond from an approved surety company, in the amount of five percent (5%) of their Proposal as a guarantee that the Proposer will enter into a contract and guarantee forms, if required, within 10 days after notice of award of contract. The successful proposer must furnish both a Performance Bond and a Payment Bond, each in the amount of 100 percent of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the Town. Question Deadline 03/29/2024 at 2:00 PM CT The deadline to ask questions. The deadline to ask questions. Further information concerning the procurement may be obtained by email only from the Town of Sunnyvale Engineering Division - Matthew Holzapfel, P.E., Town Engineer at matthew.holzapfel@townofsunnyvale.org. The project includes landscape, hardscape, irrigation, monumentation, lighting, and decorative paving improvements on Collins Road from US-80 to and including the Tripp Road roundabout. The right is reserved by the Town of Sunnyvale to reject any and all bids.

Bid Results

Roads / Highways

$1,988,730.00

Public - City

Outdoor Lighting, Paving, Site Work

94

16

28

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
68
Bidding Soon
3,636
All Active Projects
1,436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.