BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Ooltewah, Tennessee. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2024 Collegedale Greenway Extension and Parking - The project consists of the furnishing of all labor, materials and equipment, as further defined herein, for the construction and installation of a new greenway extension and parking lot between Ooltewah Ring gold Road and Little Debbie Park, located within the City of Collegedale. This project includes, but is not limited to, site demolition/clearing, the construction of full pavement sections, extruded concrete curbing, drainage infrastructure and sidewalk as indicated on the plan sheets which accompany these specifications. 2,700 CY of Unclassified Excavation 18,000 CY of Borrow Excavation 2,900 Tons of 3" TDOT 307B Binder Course 1,900 Tons of 2" TDOT 411E Surface Course 5,225 LF of Concrete Extruded Curb 17,600 SF of 5" Thick Concrete Sidewalk (variable width) The City has the right to refuse any and all bids. More information can be found on the city's website: online. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project consists of the furnishing of all labor, materials and equipment, as further defined herein, for the construction and installation of a new greenway extension and parking lot between OoltewahRinggold Road and Little Debbie Park, located within the City of Collegedale. This project includes, but is not limited to, site demolition/clearing, the construction of full pavement sections, extruded concrete curbing, drainage infrastructure and sidewalk as indicated on the plan sheets which accompany these specifications. The Owner reserves the right to wave any informalities or to reject any, any part or all of the bids, and to extend the date for the receipt of bids. Bidders must comply with all Local, State and Federal requirements for bidding, construction or installation of the work. Bidders must comply with all conditions provided in the Information for Bidders. This work consists of mobilizing and demobilizing the Contractor's and all Subcontractors' forces, supplies, equipment, and incidentals at the Project site. It shall include all Contractor and Subcontractor costs associated with obtaining performance bonds, bonds or insurance required by TDOT, and other preconstruction costs incurred after Contract award that are necessary costs to the Project and are of a general nature rather than directly attributable to other pay items. Include all necessary preconstruction costs not attributable to a specific pay item in the lump sum price for Mobilization and not in any other pay item Question Deadline 06/11/2024 Should Vendor find discrepancies in, or omissions from, this Scope of Work, or be in doubt as to any meaning, Vendor shall notify the Owner in writing or via email at least 7 days prior to the receipt of bids. The Owner will then issue a written clarification. Any interpretations and assumptions should be explicitly stated. Owner Contact: Kris McAloon 4910 Swinyar Drive Collegedale, TN 37315 kmcaloon@collegedaletn.gov This work consists of mobilizing and demobilizing the Contractor's and all Subcontractors' forces, supplies, equipment, and incidentals at the Project site. It shall include all Contractor and Subcontractor costs associated with obtaining performance bonds, bonds or insurance required by TDOT, and other preconstruction costs incurred after Contract award that are necessary costs to the Project and are of a general nature rather than directly attributable to other pay items. Include all necessary preconstruction costs not attributable to a specific pay item in the lump sum price for Mobilization and not in any other pay item

Bid Results

Sidewalks / Parking Lot

$2,839,385.00

Public - City

Paving, Site Work

24

7

4

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
30
Bidding Soon
806
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

August 19, 2024

img_map_placeholder

Collegedale Greenway, Ooltewah, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.