BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Alabaster, Alabama. Completed plans call for site work for a water / sewer project.

A. The Work included in this Contract generally consists of the installation of potable water mains and appurtenances. The requirements of this Section and Division 1 apply to all of the Contract Documents. B. Portions of the work is occurring on Alabama Department of Transportation (ALDOT) right-of-way. It shall be the responsibility of the Contractor to comply with all requirements of the permit, including traffic and erosion control. A summary of the work items is included below Furnishing and installing approximately 2,100 linear feet of 12 D.I. pipe to include a jack and bore across I-65 with a 24 steel casing, and all associated water main appurtenances, fittings, and connections to the existing system. The work of constructing the project will be let under one Contract if an award should beamed; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner. A cashier's check or bid bond payable to Alabaster Water Board, in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished by the Engineer. All bidders bidding amounts exceeding that established by the state licensing board for general contractors must be licensed under the appropriate/applicable provisions of state law, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interest of the Owner will thereby be promoted. A summary of the work items is included below: Furnishing and installing approximately 2,100 linear feet of12" D.I. pipe to include a jack and bore across I-65 with a 24"steel casing, and all associated water main appurtenances, fittings, and connections to the existing system.

Award

Water / Sewer

$776,340.00

Public - City

Site Work

11

13

5

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
49
Bidding Soon
588
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

June 1, 2024

img_map_placeholder

I-65, Alabaster, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.