Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Renovation of a water / sewer project in Maysville, Kentucky. Completed plans call for the renovation of a water / sewer project.

The work to be bid upon is described as follows: o The work consists of construction of water treatment plant improvements including but not limited to new raw water pumps and motorsin existing dry well, all associated raw water piping and valves, new VFDs, new pump control panel, new access stairs and landings, new access ladders, new HVAC blowers and louvers in dry well room, temporary sealing off intake pipes under the surface of the Ohio River, bypass pumping (1,500 GPM - 2,500 GPM), and other necessary items as stated in the Specifications and/or shown on the drawings. After award of a contract, the General Contractor will be furnished, without charge, a reasonable number of plans and specifications needed to prosecute the work. Subcontractors and manufacturers and suppliersshall obtain plans and specifications from the General Contractor. Sealed proposals for the Contract shall be clearly marked on the outside of the container as follows: "Sealed proposal for: CITY OF MAYSVILLE - DRY WELL IMPROVEMENTS Not to be opened until 2:00 PM Local Time, April 4, 2024". If forwarded by mail, the sealed envelope containing the proposal must be enclosed in another envelope and mailed to the City of Maysville, 216 Bridge Street, Maysville, KY 41056, Attention: Darin Spence; allowing sufficient time for such mailing to reach this address prior to the scheduled closing time for the receipt of proposals. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, Section 3 Segregated Facilities, Section 109 and the Contract Work Hours Standard Act. Federal law prohibits discrimination on the grounds of race, color, national origin, religion, age, handicap, and sex in this project. Minority firms are particularly encouraged to participate. Bids shall be accompanied by a certified check or bid bond payable to the City of Maysville in an amount not less than five percent (5%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified will not be considered and will be returned unopened to the bidder. The City of Maysville reserves the right to reject any and all bids and to waive formalities and any bid that is obviously unbalanced may be rejected. Provide all labor, materials, equipment and services required for demolition as shown on the Drawings and specified herein. Furnish all labor, material and equipment to install the fiber reinforced polymer products as displayed on the drawings and as specified herein.

Post-Bid

Water / Sewer

$125,000.00

Public - City

Renovation

41

27

29

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
59
Bidding Soon
890
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

img_map_placeholder

519 E Front St, Maysville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.