Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work and paving for a civil project in Elk Park, North Carolina. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
This work consists of applying Integrated Multipolymer (IMP) pavement marking to all road surfaces using standard thermoplastic application equipment. A primer shall be used for concrete and any aged asphalt surfaces as required by the Engineer. Retroreflectivity shall be obtained through intermix and drop-on reflective media. Both intermix and drop-on reflective media are required. Question Deadline 10/09/2025 Questions should be emailed 7 calendar days prior to the bid opening to Bethany Elmore at belmore@ncdot.gov. Contract No.: DK00424 WBS: 45788.3.1 Federal Aid No.: 4578801 TIP NO.: B-5835 County: Avery County Location: Replace Bridge No. 125 Over Elk River on SR 1306 (Hick Hollow Road) Type of Work: Grading, Drainage, Paving, and Structure The date of availability for this project is February 4, 2025. The date of completion for this project is November 1, 2027. If you have questions about bidding on this project or any other question concerning this project, please contact me at (336) 903-9115 or belmore@ncdot.gov. Only Electronic Bidding will be accepted for this project. Please refer to the sheets entitled Instructions to Bidders contained in the Proposal. Contractors must be pre-qualified with NCDOT as Bidder or PO Prime Contractor prior to bidding on this project. A Bid Bond or Bid Deposit in the Amount of 5% of the Total Amount Bid Will Be Required. The Bidder Shall Submit an Electronic Bid Bond With Each Electronic Bid Submittal Unless He Elects to Furnish a Bid Deposit Within 14 Calendar Days After Notice of Award is Received, the Successful Bidder Shall Submit a Fully Executed Execution of Contract, Noncollusion Certification, Debarment Certification and Gift Ban Certification Signature Sheet. NC DOT - Grading, Drainage, Paving, and Structure on SR 1306 (Hick Hollow Road)
Award
Bridges / Tunnels
$1,934,651.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
February 4, 2026
Hicks Hollow Rd, Elk Park, NC
Related To This Project
Elk Park, NC
Bid Date: Aug 05 2024
Elk Park, NC
Bid Date: Aug 05 2024
Elk Park, NC
Bid Date: Jan 09 2025
Elk Park, NC
Bid Date: Jan 31 2025
Elk Park, NC
--
Elk Park, NC
Bid Date: Apr 18 2025
Elk Park, NC
Bid Date: May 01 2025
Elk Park, NC
Bid Date: Jan 30 2024
Elk Park, NC
Bid Date: Sep 05 2023
Elk Park, NC
Bid Date: Aug 04 2023
Todd, NC
--
Lenoir, NC
--
Grassy Creek, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.