BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Auburn, Washington. Working plans call for the renovation of a water / sewer project.

Only specific contractors selected from Small Works Roster are allowed to submit. This project will remove and replace the existing 480V, 200HP variable frequency drives (VFDs) for Pumps 1 and 2 at the Fulmer Corrosion Control Treatment Facility. The work also will include a new VFD enclosure and VFD programming for each pump (2 total). The VFD enclosure will house the new VFD, 5% line and load reactors, disconnect switch, cooling fan, and door mounted keypad (one control panel for each drive, two total). Additionally, the contractor will provide factory certified startup with an extended two-year warranty. Disposal of the existing equipment will be the contractor's responsibility. Contractor will be responsible for obtaining an electrical permit. The Contractor shall complete the work within 30 working days from the Notice to Proceed Date. The City's sales tax area is 1702 for work within King County and 2724 for work within Pierce County. No payment shall be issued until a Statement of Intent to Pay Prevailing Wages form, for the Contractor and each and every Subcontractor, has been approved by the State Department of Labor & Industries, and is received by the City. The Contractor shall furnish the City with an executed performance bond for the full Contract amount, unless the contact amount is $150,000.00 or less and the Contractor has elected to have 10% retainage held by the City, in which case a performance bond is not required for this project. Submittals. All submittals shall be made electronically and shall be transmitted via e-mail to PWSubmittals@auburnwa.gov The City reserves its right to withhold payment from the Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Contract; and extra work and materials furnished without the City's written approval. If the Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and the Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any additional costs, from any and all amounts due or to become due the Contractor.

Final Planning

Water / Sewer

$150,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
26
Bidding Soon
664
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

img_map_placeholder

To Be Determined, Auburn, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.