BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Site Directions: Admin Building Parking Ramp Est. Value: $ 1,501,750.00 Est. Completion Date: Oct. 31, 2024. All questions should be submitted no later than April 3, 2024. The State is not obligated to answer questions submitted after the question due date and time A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Removal and replacement of all undgerground drainage piping at Levels A and B. Two (2) new flammable waste traps. 2. Sanitary and Storm sewer connections in University Ave. 3. Removal and Replacement of concrete slab-on-grade. 4. New access openings at Levels C and E for vacuum hoses for waste trap cleaning. 5. Re-Striping of Levels A and B. Chain Link fencing. This Project has an 8% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor.

Bid Results

Sidewalks / Parking Lot

$1,078,000.00

Public - State/Provincial

Paving, Site Work

15

18

5

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
146
Bidding Soon
1,575
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

June 10, 2024

Project location map

50 Sherburne Ave, Saint Paul, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.