Site work and paving for a civil project in Jericho, New York. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

All questions must be submitted, in writing, to Anthony Cucuzzo no later than 4:00 p.m. on Friday, March 22, 2024 The Contract generally consists of water main installation, connections to existing water mains, hydrant replacement, and site restoration throughout the project area. The work included under this Project consists of furnishing all labor, materials, equipment and incidentals necessary for the construction of water mains, including pipes, valves, fittings, hydrants, and site restoration. The work is to be performed for the Jericho Water District along NYS Route 106 for National Grid. Detailed work requirements are contained in the Drawings and Specifications. The Contract Documents, consisting of Advertisement for Bids, Instructions to Bidders, Bidder's Checklist, Bid, Bid Bond, Statement of Surety's Intent, Agreement, General Conditions, Supplementary Conditions, Payment Bond, Performance Bond, Maintenance Bond, Drawings, Specifications and Addenda may be examined at the following locations: Jericho Water District 125 Convent Road Syosset, NY 11791 D&B Engineers and Architects, D.P.C. 330 Crossways Park Drive Woodbury, NY 11797-2015 Complete digital sets of Bidding Documents, drawings and specifications, will be available, and may be obtained online. Neither Owner nor Engineer will be responsible for full or partial sets of the Contract Documents, including Addenda if any, obtained from sources other than the issuing office. All bidders must obtain a set of the Contract Documents and All Addenda. Each Bid must be accompanied by a certified or bank cashier's check made payable to OWNER, or a Bid Bond issued by a surety licensed to conduct business in the state where the Project is located and having a Best Rating of A- or better from A.M. Best Company and named in the current list of "Companies Holding Certificates of Authority as Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury, in an amount not less than five percent of the amount of the Bid submitted. The list may be ordered from the Government Printing Office Bookstore, 26 Federal Plaza, Room 110, New York, NY 10278, (212) 264-3825. Each Bidder must complete and submit with their bid the "Iranian Investment Activities Certification" provided in the Bid Form in compliance with General Municipal Law 103-g, Iranian Energy Sector Divestment. Each Bidder must complete and submit with their Bid the "Certification of Compliance with New York State Labor Law Section Two Hundred One-G" provided in the Bid Form regarding the implementation of a written policy addressing sexual harassment prevention in the workplace. The Bidder to whom the OWNER proposes to award the Contract will be required to furnish performance and payment bonds and the necessary insurance certificates as prescribed in the General Conditions and the Supplementary Conditions upon the execution of the Agreement within ten (10) days of the Notice of Award. Bidders are required to execute a non-collusive bidding certification required by Section 103-d of the General Municipal Law of the State of New York. The attention of Bidders is particularly called to the requirements as to the conditions of employment to be observed and the minimum wage rates to be paid under the contracts. Bidders are also required to comply with the anti-discrimination provisions of Sections 290-301 of the Executive Law of the State of New York. The OWNER reserves the right to reject any or all of the Bids received, to readvertise for Bids, to abandon the project, to waive any or all informalities in any Bid received and to accept any proposal which the OWNER decides to be for the best interest of the OWNER. A public meeting may also be held at the time and place noted above wherein the District will conduct such regular and other business which is properly brought before the Board of Commissioners. All questions must be submitted, in writing, to Anthony Cucuzzo no later than 4:00 p.m. on Friday, March 22, 2024. Questions must be sent via email to acucuzzo@dbeng.com. Award of Contract. OWNER reserves the right to reject any and all Bids and waive any and all informalities, and the right to disregard all nonconforming or conditional Bids or counter proposals. In evaluating Bids, OWNER shall consider the qualifications of the BIDDERS, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices, if requested in the Bid Forms. The OWNER may consider the qualifications and experience of Subcontractors and/or Suppliers who are to furnish the items of equipment for those portions of the Work as to which the identity of the Subcontractor and/or equipment Suppliers must be submitted as specified in the Bid. The OWNER may conduct such investigations as they deem necessary to establish the responsibility, qualifications and financial ability of the BIDDERS and equipment Suppliers to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. OWNER reserves the right to reject the Bid of any BIDDER who does not pass any such evaluation to OWNER's satisfaction. If a contract is to be awarded, it will be awarded to the lowest responsive responsible BIDDER whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the Project. If the Contract is to be awarded, OWNER will give the apparent successful BIDDER a Notice of Award within forty-five days after the day of the Bid opening. Simultaneously with delivery of the executed counterparts of the Agreement to OWNER, the apparent successful BIDDER shall deliver to OWNER the required Contract Security. The undersigned and OWNER recognize that time is of the essence of the Agreement to be executed by the undersigned (if awarded the Contract) and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 1 above. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and BIDDER agree that as liquidated damages for delay, but not as a penalty, BIDDER shall pay OWNER $1,500 for each consecutive calendar day that expires after the time specified in paragraph 1 above for Substantial Completion. If BIDDER shall neglect, refuse, or fail to complete the remaining Work within the Final Contract Time or any proper extension thereof granted by OWNER, BIDDER shall pay OWNER $1,500 for each consecutive calendar day that expires after the time specified in paragraph 1 above for Final Completion and readiness for final payment until the Work is completed and ready for final payment. The undersigned BIDDER warrants and represents, if awarded the Contract, that any work order proposed herein will be substantially completed in accordance with Section 14 of the General Conditions within 45 consecutive calendar days after the date when the Contract Time commences to run as provided in Section 2 of the General Conditions, and finally completed and ready for final payment in accordance with Section 14 of the General Conditions within 15 consecutive calendar days after the date of Substantial Completion (Final Contract Time). Bid Bond or certified check Minimum of 5% of contract bid. Bond Form EJCDC 430 Current Edition or certified check Final Bonds Performance and Payment bonds (labor & materials) Minimum Limit 100% of Contract Price Maintenance Bond Minimum Limit 100 % of Performance and Payment Bond Term - 2 Year from Acceptance of Job

Bid Results

Water / Sewer

$384,540.00

Public - County

Paving, Site Work

9

10

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Compaction, Shoring and Underpinning, Shoring, Timber Shoring
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
298
Bidding Soon
4,570
All Active Projects
2,176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

img_map_placeholder

NY-106, Jericho, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Main Offset Along Route 106 for National Grid - Site / Civil

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.