BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lansing, Illinois. Completed plans call for the renovation of a educational facility.

Site landscaping; All other work indicated on the drawings and in the project manual for this project. All work on this project will be awarded to one Prime Contractor. Asbestos abatement work in existing school building will be performed by a separate abatement contractor under the direction of the Owner's consultant as listed above. There is no prebid meeting scheduled. Contractors are expected to visit the site and review existing conditions. Board of Education of School District 158 that sealed bids will be received for the Lester Crawl Primary Center Expansion/Renovation Project Phases 3 & 4 located at 18300 Greenbay Avenue, Lansing, Illinois, in the following bid categories: Bid Package 17 - Landscaping. Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to School District 158 in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Board of Education of School District 158 for a period of sixty (60) days after the scheduled time of closing bids. All employees of the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Department of Labor in accordance with the applicable provisions of the "Wages of Employees on Public Works Act" (Prevailing Wage Act, Illinois Rev. Stat., 820 ILCS 130/1 et. seq.) and with all applicable provisions of the "Illinois Preference Act", 30 ILCS 570/.01 et. seq. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "B+9" in accordance with Best's Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 158 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 158. The Owner reserves the right to reject any and all proposals or bids. Pre-Bid RFI Deadline Wednesday, March 27, 2024 at 12:00 am Pre-Bid RFI Dana Petraitis - dana@jmaarchitects.com Office: 7083393900 ext. 120 JMA Architects - South Holland, Illinois 60473 United States It is anticipated that contracts will be awarded by the School District 158 Board of Education on April 17, 2024. Construction shall commence following award and completion of pre-construction submittal requirements. B. The successful contractor and respective subcontractors shall secure certificates of insurance and performance and payment bonds, order materials, and commence immediately upon being a letter of intent and notice to proceed from the Owner and obtain definite commitments from suppliers and sub-contractors to comply with the progress schedule to be prepared by the Architect. C. Available work hours for the contractorsi work day are those hours between 7am and 4:30 pm. Successful bidder shall immediately give Owner and Architect notice of intended work hours once receiving notice to proceed. It is the intent of this contract that all work will occur during an eight hour work day, Monday through Friday. No work will be permitted outside of these hours and days unless written permission has been granted by the Owner. D. No work will be allowed in the existing building during occupied times unless specifically authorized by the Owner. All work in the existing building must first be coordinated with the Owner prior to proceeding.

Award

Educational

$66,020.00

Public - City

Renovation

5

7

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
124
Bidding Soon
1,743
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 18, 2024

img_map_placeholder

18300 Greenbay Ave, Lansing, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.