BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and addition to a water / sewer project in Houston, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Christy Glen Lift station pump addition. There will be a MANDATORY pre-bid meeting at 10:00 AM on Tuesday, November 12, 2024, at the office 1616 S. Voss Rd., Suite 300, Houston, Texas 77057. A Bid bond, cashier's check or certified check in an amount equal to five percent (5%) of the total bid must accompany each proposal. The Owner reserves the right to reject any or all bids or to accept any bid deemed advantageous to it and waive informalities and defects in the bids and in the bidding process. All bids received after the closing time designated above may be returned unopened at the discretion of the Engineer. The successful bidder must furnish a performance and maintenance bond and payment bond in the amount of one hundred percent (100%) of the contract price in a form and from a Surety company meeting the requirements specified in the contract documents. Each bidder is expected to inform himself fully of the construction and labor conditions under which the work will be performed, and will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents and Technical Specifications and Plans. Attention is directed to the Bid Form wherein either a blank space is provided for the bidder to enter the number of days within which he agrees to complete the work, or the completion time for the work is specified. The general contract for the construction of the proposed facilities will be entered into and payment made pursuant to the terms of the Contract Documents. The Standard Form of Agreement between Owner and Contractor and the General Conditions, as adopted by the Engineers Joint Contract Documents Committee, will be included in the Contract Documents. Unless it elects to reject all bids, Owner will have sixty (60) days in which to award the Contract from the date that the bids are to be received. A thorough analysis will be made of all bids submitted.

Post-Bid

Water / Sewer

$2,006,685.00

Public - State/Provincial

Addition, Demolition, Site Work

29

7

42

3

Subscribe For Documents

151 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
59
Bidding Soon
2,719
All Active Projects
1,049
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.