BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 29, 2024, the project was awarded to Warning lites in the amount of $29,158.50.** The Work. Contractor shall perform the work more fully described in the attached Exhibit A (the "Work"). The Work includes all work and services required by this Agreement, whether completed or partially completed, and includes all labor, materials, equipment, and services provided or to be provided by Contractor to fulfill Contractor's obligations. All Work shall be completed according to the specifications set forth in the attached Exhibit B. Time for Completion. Contractor shall proceed diligently and shall complete the Work to the satisfaction and approval of the City's authorized agent according to the length of time set forth in Exhibit A (the "Contract Time"). Contractor shall to notify the City in writing of any cause of delay of the Work within 24 hours after such cause of delay arises. If Contractor fails to complete the Work by the Contract Time, the City may immediately, or at any time thereafter, proceed to complete the Work at Contractor's expense. If Contractor gives written notice of a delay over which Contractor has no control, the City may, at its discretion, extend the Contract Time. Work. The Work will consist of the placement of centerline, lane, and shoulder striping on designated streets within the City of Golden Valley. It may also include stop lines, directional arrows, and pavement lettering. Contractor shall furnish the City with certifications that the pavement marking material & epoxy resin meets the requirements for the paint specified. All paint used for centerline and lane striping shall be reflectorized paint meeting the MNDOT Specifications 2582. All epoxy markings shall be done in accordance with the Specifications for Epoxy Resin Pavement Markings (free of toxic heavy metals) in the Appendix. Schedule. The Work shall commence no sooner than July 15th, 2024 and completed no later than October 5th, 2024.

Award

Roads / Highways

$29,159.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
85
Bidding Soon
806
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Golden Valley, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.