BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2024 at 8:00 PM

Updated May 1, 2024

Site work and paving for a road / highway in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 29, 2024, the project was awarded to Warning lites in the amount of $29,158.50.** The Work. Contractor shall perform the work more fully described in the attached Exhibit A (the "Work"). The Work includes all work and services required by this Agreement, whether completed or partially completed, and includes all labor, materials, equipment, and services provided or to be provided by Contractor to fulfill Contractor's obligations. All Work shall be completed according to the specifications set forth in the attached Exhibit B. Time for Completion. Contractor shall proceed diligently and shall complete the Work to the satisfaction and approval of the City's authorized agent according to the length of time set forth in Exhibit A (the "Contract Time"). Contractor shall to notify the City in writing of any cause of delay of the Work within 24 hours after such cause of delay arises. If Contractor fails to complete the Work by the Contract Time, the City may immediately, or at any time thereafter, proceed to complete the Work at Contractor's expense. If Contractor gives written notice of a delay over which Contractor has no control, the City may, at its discretion, extend the Contract Time. Work. The Work will consist of the placement of centerline, lane, and shoulder striping on designated streets within the City of Golden Valley. It may also include stop lines, directional arrows, and pavement lettering. Contractor shall furnish the City with certifications that the pavement marking material & epoxy resin meets the requirements for the paint specified. All paint used for centerline and lane striping shall be reflectorized paint meeting the MNDOT Specifications 2582. All epoxy markings shall be done in accordance with the Specifications for Epoxy Resin Pavement Markings (free of toxic heavy metals) in the Appendix. Schedule. The Work shall commence no sooner than July 15th, 2024 and completed no later than October 5th, 2024.

Award

Roads / Highways

$29,159.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
125
Bidding Soon
1,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

July 15, 2024

Project location map

Multiple Locations, Golden Valley, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.