BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Glendora, California. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Convert Traffic Signals from pedestal mounted to mast arms at the intersection of Route 66 and Barranca Avenue. Installation of protected Left Turn Phasing at the intersections of Gladstone St & Sunflower Ave, Juanita Ave & Sunflower Ave, and Gladstone St & Valley Center Ave. Addition of high visibility crosswalk. Upgrade PPB to APS pedestrian button as needed. Upgrade and install new signal controller and cabinet as needed. Upgrade conduits, signal wires and rewired signal as needed. Upgrade to Video Detection System. Deadline for questions and objections: Tuesday April 04, 2024, at 5:00 PM PST The scope of the service shall include preparing preliminary drawings, design plans, specifications, and cost estimates for the traffic signal improvements of the following intersections: (1) Route 66 and Barranca Avenue (2) Gladstone Street and Sunflower Avenue (3) Juanita Avenue and Sunflower Avenue (4) Gladstone Street and Valley Center Avenue Consultant shall inspect the existing traffic signals, controller, cabinet, wiring, pedestrian push button, signs, crosswalk, and any other deficiencies. The findings of the inspections shall be used in recommendation for traffic signal modification options. Consultant shall consider NPDES requirements for drainage and hazardous material storage The designed drawings shall show the proposed traffic signal modifications and incorporate the items in Exhibit "A." The following items of work are to be included: 1. Convert Traffic Signals from pedestal mounted to mast arms at the intersection of Route 66 and Barranca Avenue 2. Installation of protected Left Turn Phasing at the intersections of Gladstone St & Sunflower Ave, Juanita Ave & Sunflower Ave, and Gladstone St & Valley Center Ave. 3. Addition of high visibility crosswalk. 4. Upgrade PPB to APS pedestrian button as needed. 5. Upgrade and install the new signal controller and cabinet as needed. 6. Upgrade conduits, signal wires and rewired signal as needed. 7. Upgrade to Video Detection System

Post-Bid

Roads / Highways

$20,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

1

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
106
Bidding Soon
2,199
All Active Projects
865
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Glendora, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.