BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Akron, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The 2024 Resurfacing and Miscellaneous Paving - Phase 1 project is a citywide resurfacing project that includes numerous streets in each ward for approximately 20 centerline miles of resurfacing. Major project components include the removal of the asphalt surface course, adjusting of manhole and valve box castings by riser rings, intermediate course paving (as directed) and surface course paving. Additional work may include additional asphalt depth removal, underdrain installations, subbase replacement, manhole casting and valve box adjustments, base course asphalt paving, intermediate course paving and railroad coordination as directed by the Engineer. City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 10% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Except as provided in Section 103.05 of the City of Akron, Construction and Materials Specifications, 2008 Edition, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. Deadline for Questions to City March 27 by 11:00 am Deadline for City Issuance of Responses to Questions March 28 by 11:00 am Contract Award (estimated) April 15 The Contract completion date for all Arterial/Collector and Residential streets both improved and unimproved is 180 calendar days after receipt of the Notice to Proceed, unless extended in writing by the Director of Public Service. For each calendar day that any work remains uncompleted after the contract completion date, $1000 will be deducted from any money due the Contractor, not as a penalty but as liquidated damages per AEB Section 108.07. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities.

Bid Results

Roads / Highways

$3,160,159.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
66
Bidding Soon
1,176
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.