BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in New York, New York. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project limits extend from approximately 280 feet southeast of the existing bridge along Noble Street to approximately 350 feet northwest of the existing bridge along Factory Street, including work along Willow Street from the intersection with Noble/Factory Street to approximately 150 feet southwest of the intersection with Noble/Factory Street. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: complete removal of the existing culvert superstructure and substructures and replacement with a new single span, precast concrete 3-sided frame units, construction of strip footings founded on piles, realignment of Noble/Factory/Willow Street within the project limits, re-alignment of the intersection of Noble/Factory/Willow Street, installation of new sanitary pump station, relocation of sanitary, water, and drainage systems, installation of SPDES stormwater treatment swale, installation of sidewalks and curbing within project limits, and reconstruction of roadway approaches as required to accommodate bridge replacement efforts. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance and Payment Bonds guaranteeing performance of work and prompt payment from an acceptable Surety Company for an amount not less than 100% of the accepted bid. Receipt of bids by Jefferson County shall not be construed as authority to bind Jefferson County. Construction work shall not begin prior to May 1, 2024 and shall be substantially completed and ready for final payment by September 30, 2025. A mandatory winter shutdown will be required between November 1,2024 and April 30, 2025. The DBE goal for this project is: 4% There are no M/WBE goals for this project. The EEO Employment goals for this project are: 2.5% Minority Employment Goal 6.9% Women Employment Goal The use of the NYSDOT approved civil rights reporting software, Equitable Business Opportunities (EBO), is required. Jefferson County reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the Jefferson County Board of Directors before any award of contract may be made. Question Deadline 03/26/2024 No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening Questions regarding the Contract Documents should be directed to James Lawrence, Jr., Jefferson County or Thomas R. Butler, Stantec Consulting Services Inc. either through email at: jlawrence@co.jefferson.ny.us, tom.butler@stantec.com or by telephone at (315) 786-3600, (585) 413-5261. Successful bidders will be required to pay prevailing wage rates on this contract.

Post-Bid

Roads / Highways

$650,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
248
Bidding Soon
4,708
All Active Projects
2,181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

May 1, 2024

img_map_placeholder

Noble St, New York, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.