Site work and new construction of a civil project in Boardman, Oregon. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The Owner reserves the right to change the date and time for opening bids. All bidders on the bidder's list will receive an emailed invite to attend the virtual meeting. The Project includes furnishing all labor, materials, and equipment necessary for the construction of an industrial wastewater secondary treatment facility with an average daily flow of 9 million-gallons-per-day (MGD) and future peak flow of 26 MGD. Project includes site piping and utilities; flow diversion structure; oxidation ditch flow split; oxidation ditch (three trains); mixed liquor flow split; four secondary clarifiers and two scum pump stations; RAS/WAS pump station; denitrifying filter; effluent pump station; utility water system; plant drain pump station; sludge holding tanks; solids building with dewatering equipment and an electrical room; solids pump building; cake storage area; carbon chemical feed building with pumps and tanks; alkalinity chemical feed system with pumps and tanks; control building with a lab, electrical room, and blower room; two electrical buildings; standby generator; SCADA system including electrical and fiber optic communications systems; and site improvements. This Project is anticipated to be funded by the United States Environmental Protection Agency (EPA)'s Water Infrastructure Finance and Innovation Act (WIFIA). As such, all work on this Project is subject to the Federal American Iron and Steel (AIS) requirements, as well as all other WIFIA requirements, except for the Build America, Buy America Act, for which Owner has obtained a waiver. Materials specified to be incorporated into this Project shall meet the AIS requirement of P.L. 113-76, Consolidated Appropriations Act, 2014. The Contractor awarded the Project shall adhere to all requirements stated within the Specifications and other WIFIA requirements. Each bid form shall include specific acknowledgment, in the space provided, of bidder's understanding of the WIFIA funding requirements. Failure to so acknowledge may result in the bid being rejected as not responsive. Ask Project Questions April 19, 2024, at 5:00 PM Refer all technical questions in writing to: Austin Rambin, PE Consor One Columbia Street, Suite 1700 Portland, Oregon 97204 Phone: 503-225-9010 Email: austin.rambin@consoreng.com The Owner reserves the right to reject any and all bids not in compliance with all prescribed public bidding procedures and requirements and to reject for good cause any or all bids upon a finding of the agency that it is in the public interest to do so. Bidders are responsible for all of their costs incurred in preparing and submitting a bid. Bidders must be qualified by the State of Oregon Construction Contractors Board, hold all other necessary licenses, and be qualified in accordance with the applicable portions of ORS 279C in order to enter into a contract with the Owner for a public works project in Oregon. Bidders must provide contact name, company name, contact information (i.e., mailing address, email address, and phone number) to be placed on the bidder's list to receive a link to the filesharing site where they may download the Contract Documents, and receive notifications regarding any addenda. Addenda are part of the contract documents. Addenda notifications will be e-mailed by the Owner to the bidders as a courtesy only; it is the responsibility of each bidder to ensure the bidder has received a copy of all addenda that have been issued and posted to the filesharing site. Each bid form shall include specific acknowledgment, in the space provided, of receipt of all addenda issued by the Owner during the bidding period. Failure to so acknowledge may result in the bid being rejected as not responsive. The Project is a public works project as defined in ORS 279C. Oregon Prevailing Wage Rates and Davis-Bacon Wage Rates will apply for this Project. Bidders shall comply with the requirements of those statutes. Owner reserves the right to modify this schedule of events at any time in the best interests of the Owner. Any changes to the schedule occurring before bid opening will be issued within an addendum. Owner Scoring (tentative) May 6, 2024, Notice of Award Distributed (tentative) May 6, 2024, Owner Board Contract Authorization (tentative) May 13, 2024, Commencement of Contract (tentative) May 20, 2024, Commencement of Project (Notice to Proceed) May 27, 2024, Substantial Completion of Project June 1, 2025, Completion of Project July 1, 2025
Award
Water / Sewer
$178,430,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
December 2, 2024
To Be Determined, Boardman, OR
Related To This Project
Boardman, OR
Bid Date: Apr 24 2024
Boardman, OR
--
Boardman, OR
Bid Date: May 23 2024
Boardman, OR
Bid Date: May 16 2024
Boardman, OR
Bid Date: May 23 2024
Boardman, OR
Bid Date: Jun 06 2024
Boardman, OR
Bid Date: Jun 27 2024
Boardman, OR
Bid Date: Mar 21 2024
Boardman, OR
Bid Date: Jul 18 2024
Boardman, OR
Bid Date: Mar 05 2024
Boardman, OR
Bid Date: Sep 24 2019
Boardman, OR
Bid Date: Feb 29 2024
Boardman, OR
Bid Date: Aug 06 2020
Boardman, OR
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.