BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Naperville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

The scope of this construction contract involves electrical and concrete work necessary to add pedestrian signals and ramps on the east side of the 95th and Skylane intersection. The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies and material associated with the 95th & Skylane Signal Modification project. The work generally includes the installation of a pedestrian crossing on the east side of the intersection of 95th Street and Skylane Drive and associated modifications to the existing traffic signal. The project consists of furnishing and installing new traffic signal posts and conduit, cables, sidewalk, pedestrian signal heads and pushbuttons at the intersection. The items to be installed under this contract include concrete, traffic signals, as well as other incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The project will also require the maintenance of existing traffic signal installations. Bid Bond 10% on-site work started before June 10, 2024 ; The work should be substantially complete by August 7, 2024. All work, including punchlist items, with this contract shall be completed by August 15, 2024 (Final Completion Date). Question Deadline 04/01/2024 at 12:00 PM CT All questions concerning this bid shall be submitted in writing at least five business days prior to the online bid opening to Ryan La Russo at larussor@naperville.il.us.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

26

5

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
120
Bidding Soon
1,765
All Active Projects
796
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

June 10, 2024

img_map_placeholder

Skylane Dr & 95th St, Naperville, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.