Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2024 at 8:00 PM
Updated May 7, 2024
Site work and paving for a road / highway in Westport, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Contractor shall furnish all labor, tools, equipment, appliances, and materials as required, shown on the Contract Drawings, if applicable, and described in these specifications. The principal items of Work are as follows: a. The maintenance of traffic through the work zone during all paving and reconstruction operations through the use of certified flaggers or police personnel supplied by the Town as necessary. These persons shall coordinate the safe flow of traffic at all times and shall not be a part of the paving operation. All barricades, cones, advanced warning signs, and symbols necessary shall be provided by the contractor. b. Preparation of the roadway or parking lot prior to overlay. This shall include full depth reclamation where indicated, profile milling, milling of keys, shimming or leveling course required in the technical specifications. All areas to be paved shall receive a tack coat in accordance with the specifications. c. Placement of bituminous concrete pavement at the specified thickness where indicated respectively, on town roads or parking areas inclusive of tack coat in accordance with the specifications. The work items described above do not define the complete list of work items required to complete the overlay improvements. The Contractor shall be responsible to perform all other associated work necessary for the completion of the project. In addition, the contractor will be required to obtain all necessary licenses and permits required to construct the facilities, and assist others in conducting inspections related to the work.
Award
Roads / Highways
$1,316,048.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2024
April 15, 2024
Multiple Locations, Westport, CT
Related To This Project
Westport, CT
Bid Date: Apr 25 2024
Westport, CT
Bid Date: May 02 2024
Westport, CT
Bid Date: Apr 25 2024
Westport, CT
--
Westport, CT
--
Westport, CT
--
Westport, CT
--
Westport, CT
--
Westport, CT
Bid Date: Apr 24 2024
Westport, CT
Bid Date: Apr 25 2024
Westport, CT
Bid Date: Mar 13 2024
Westport, CT
Bid Date: Apr 03 2024
Westport, CT
Bid Date: Apr 03 2024
Westport, CT
Bid Date: Feb 29 2024
Westport, CT
Bid Date: Nov 26 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
