Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Hawkeye, Iowa. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
240416 S1 County: Fayette Working Days : 65 Estimated Value : $250,000 - $500,000 BRS-C033(155)--60-33 ROUTE: B44 On B44, Over SMALL DRY RUN, S9 T95 R10 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 003 - Bridge Replacement - CCS - B44 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$403,284.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2024
August 5, 2024
B44, Hawkeye, IA
Related To This Project
Hawkeye, IA
--
Hawkeye, IA
--
Hawkeye, IA
Bid Date: Mar 19 2024
Hawkeye, IA
Bid Date: Mar 16 2021
Hawkeye, IA
Bid Date: Feb 15 2022
Hawkeye, IA
Bid Date: May 16 2023
Hawkeye, IA
Bid Date: Mar 21 2023
Hawkeye, IA
Bid Date: Sep 29 2022
Breda, IA
Bid Date: Apr 09 2024
Altoona, IA
Bid Date: Apr 16 2024
Williamsburg, IA
Bid Date: Apr 16 2024
Delhi, IA
Bid Date: Apr 05 2024
Emerson, IA
Bid Date: Apr 16 2024
Ottumwa, IA
Bid Date: Apr 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.