Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2024 at 8:00 PM

Updated May 3, 2024

Site work and paving for a mixed-use development in Fremont, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 22, 2024, this project has not yet been awarded. The project is expected to be awarded sometime in April 30th.** Three traffic signal modifications occurring at 23rd and Clarkson Street, 23rd Street and Bell Street, and 23rd Street and Luther Road. The work is generally described as traffic signal upgrades, including new equipment, conduit, conductor, detection, signal poles, signal heads, sidewalk, and curb ramps. Est. Value: $ 696,314.00 Est. Completion Date: Nov. 20, 2024

Award

Roads / Highways

$636,816.00

Public - City

Paving, Site Work

25

5

4

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
84
Bidding Soon
928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

May 8, 2024

Project location map

Multiple Locations, Fremont, NE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed