BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Riverside, California. Contact the soliciting agency for additional information.

Online Q&A Yes Q&A Deadline 04/18/2024 4:00 PM (PDT) a.) Task 1: Project Management: The consultant shall provide all efforts to manage all tasks in a cost effective, timely, and professional manner, including but not limited to, overseeing consultant efforts; attend kick-off meeting with SAWPA staff to solicit input and confirm approach and criteria; provide regular project status and invoices of appropriate detail and participate in (2) workshop with SAWPA staff to review findings and incorporate feedback. b.) Task 2: Audit: Data Review and Assessment: The consultant shall gather and review all pertinent documentation pertaining to the Sewer System Management Plan and compliance with WDR Order WQ 2022-0103-DWQ. SAWPA staff shall make themselves available to answer questions and deliver requested documentation or records. The Audit shall comply with the General Order and include at a minimum the following elements: o Evaluate the implementation and effectiveness of the Brine Line SSMP in preventing Spills; o Evaluate SAWPA compliance with WDR Order WQ 2022-0103-DWQ; o Identify SSMP deficiencies in addressing ongoing spills and discharges of waters of the State; o Identify necessary modifications to the Sewer System Management Plan to correct deficiencies. c.) Task 3: Draft and Final Audit Report: The consultant shall prepare a draft and final audit report of the findings as a result of Task 2. Consultant shall submit the draft report to SAWPA for review and incorporate comments. Then consultant shall submit to SAWPA for final review. The report shall be in the format of a technical memorandum. The future SSMP update in 2025 will document the implementation of the recommendations made in the Final Audit Report; Therefore the Final Audit Report must meet all standards of the Internal Audit Report described in WDR Order WQ 2022-0103-DWQ. The Draft and Final Report will include at a minimum: o Audit findings with recommended actions; o A statement that sewer system operators' input on the audit findings has been considered; o A proposed schedule for SAWPA to address identified deficiencies. o Create a template for future internal audits that comply with these requirements.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
104
Bidding Soon
2,260
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

img_map_placeholder

Multiple Locations, Riverside, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.