Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Rye, New Hampshire. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
Start Date: No Earlier than April 15, 2024 Completion Date: May 24, 2024 Description: Over the course of the winter, sand from Wallis Sands has been redistributed by wave action so that large volumes of sand have been moved towards the low tide and high tide line exposing the concrete seawall that runs the length of the beach. This project involves re-grading the sand from the low tide line towards the seawall and stair ways, over the length of the Beach. The start date for the Project will be no earlier than April 15, 2024 and the completion date will be no later than 12:00 pm on May 24, 2024. PERFORMANCE AND PAYMENT BOND In the event the bid is $75,000 or more, the contractor shall furnish security by bond or otherwise in an amount equal to 100% of the contract guaranteeing performance and payment. The payment security shall meet the requirements of RSA 447:16. PROPOSAL GUARANTEE None Required RIGHT TO WORK IN N.H. All bidders must be registered and have a certificate of existence from the New Hampshire Secretary of State, Corporate Division (telephone 603-271-3246) in order to do business with the State of New Hampshire. SUBSTANTIAL COMPLETION & FINAL INSPECTION When the work is substantially complete, the Contractor shall submit to the Project Manager, a list of items of work; to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all work in accordance with the Contract Documents. On the basis of an inspection by the Project Manager which determines that the work is substantially complete, a Certificate of Substantial Completion shall establish the date of substantial completion and state the responsibilities for any damage to the work and insurance, and fix the time limit within which the Contractor shall complete the items listed herein. Warranties required by the Contract documents shall commence on the date of Substantial Completion unless otherwise provided in the Certificate of Substantial Completion. If the Contractor fails to proceed to complete the items on the "punch list", then in addition to the corrective measures listed in the Certificate of Substantial Completion, the Commissioner may use the monies still due the Contractor to have such items completed and the Contractor shall lose any claim to the monies used. Upon written notice that the Work is ready for final inspection and acceptance, the Project manager shall promptly make such inspection, and when he finds the Work acceptable under the Contract documents and the Contract fully performed, a Certificate of Final Payment will be issued. Final inspection will be made by the DNCR Project Manager on or before May 24, 2024 at 12:00 pm. Incomplete items necessary to complete the project shall be done prior to final payment. The completion time and data for this project is no later than 12:00 pm. May 24, 2024. PROSECUTION OF WORK Upon starting the work within the 15 days set forth by this contract, the Contractor shall prosecute the work a minimum of 8 hours daily per working day until completion, excluding breakdowns or inclement weather. If the Contractor finds it impossible to start the work as stated above, he may make a written request to the Project Manager for an extension of time. Any such request shall be made prior to expiration of the allowable 15 days, and shall contain reasons which the Contractor believes will justify the granting of his request. In his request, the Contractor shall submit his proposed starting date. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Water / Sewer
$24,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
April 15, 2024
1050 Ocean Blvd, Rye, NH
Related To This Project
Rye, NH
--
Rye, NH
Bid Date: Oct 07 2024
Rye, NH
Bid Date: Oct 15 2020
Rye, NH
Bid Date: Nov 07 2024
Rye, NH
Bid Date: Mar 21 2024
Rye, NH
Bid Date: Apr 04 2024
Rye, NH
Bid Date: Apr 04 2024
Rye, NH
Bid Date: Apr 04 2024
Rye, NH
Bid Date: Mar 19 2020
Rye, NH
Bid Date: Mar 19 2020
Rye, NH
Bid Date: Dec 04 2023
Rye, NH
Bid Date: Apr 20 2023
Rye, NH
Bid Date: Mar 30 2022
Rye, NH
Bid Date: Feb 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.