Site work and paving for a road / highway in Bloomer, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Cooks Valley will accept bids for base coarse, pulverizing, paving, and shouldering on Cooks Valley Town roads 70th St. south from 150th Ave to 148th Ave, then west on 148th Ave to junction with 60th street Total length is approximately 1.25 miles... Please check distances for accuracy. Specifications include: o 70th St. approximately 1/4 mile in length o 148th Ave approximately 1 mile in length. o Pulverizing of old road bed and inject Aggregate Base Stabilizer o Paving 2 1/2 inches compacted depth 2-10 foot lanes with 3% slope from center with driveway and mailbox bump outs. o Shouldering 3/4 inch gravel 2 foot wide compacted both sides of road including driveway leveling o 3 inches of 1 1/4 inch base coarse compacted 24 ft wide. See bid form for complete details. Contractor must comply with all State and Federal Air and Water Quality Standards. All contractors are responsible for traffic control during their project. Bids must be completed on the township's bid form and will only be accepted on this form. The Town Board reserves the right to reject any or all bids or parts of bids and accept the bid most advantageous to the township. Project Site and Scope of Work 70 th Street and 148 th Ave Town of Cooks Valley T30N, R10W, Section 24-25 . The work under this contract shall consist of pulverize, injection of aggregate stabilizer, relay and compaction of pulverized material, sawing of pavement on 70 th St intersection with 150 th Ave , 148 th Ave intersection with 60 th St and all paved driveways (2ft .bump out) along roadway, final grading, prepare foundation for asphaltic paving and apply asphaltic surface on various roadways in Town of Cooks Valley. An aggregate stabilizer is to be applied to 70 th St. and 148 th Ave. Roadway approximate dimentions are as follows:. 70 th St starting at 150 th Ave then south to 148 th Ave..1320 ft in length 20 ft in width 148 th Ave starting at 70 th St. then east to 60 th St. 5280 ft in length and 20 ft width For further information, contact Chairman Darrel Fehr at [715] 829 2311 or email cv1927@bloomer.net.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
283
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Bloomer, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.