BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a medical facility in Parsons, Kansas. Completed plans call for the remodel of a medical facility; and for the renovation of a medical facility.

Five percent (5%) of the total bid amount is required. Questions/Addenda: Questions requesting clarification of the bid must be submitted in writing to the Procurement Officer indicated above: Before the end of the day, on Tuesday, April 9, 2024. Answers to questions will be available in the form of an addendum on the Procurement and Contracts' website, Scope of Work Project: Remodel Kitchen in New Visitor Center/Coordination Center-Old Library The location of the project is inside the Coordination Center Building of Parsons State Hospital (PSH), in the old library area. The kitchen area is to be updated and shall include painting walls, trim, and cabinets, new counter tops, new appliances, and new floor covering, as well as a window removed and a pass-through window opening created, and possibly new ceiling tiles. Bids shall include removal and replacement of all existing countertops, sink and appliances. If the appliances are still working, they will be transferred to the Butler Building (a storage facility on grounds at PSH) and replaced with new units. If the appliances are not operational, they shall be properly disposed of, and new units installed. Bids shall include demolition and construction/installation labor, as well as all new equipment, sink, appliances, flooring, ceiling tiles, and countertops. The cabinets, walls and trim shall be painted, PSH staff will supply color choice before the project begins. New countertops and backsplash shall be installed. New sink and faucets shall be installed. Selection of style and color, pending approval of PSH staff. New appliances shall include stove, refrigerator, and microwave. Please make recommendations after previewing the space and electrical capacity of the space and building. New flooring, (suggested laminate overlay, installed over top of existing tile), shall be installed. New ceiling tiles shall be installed. The current window shall be removed, and a pass-through space provided, with a shelf mounted on the outside of the existing wall. The support beams shall remain in the window area and be trimmed out, as they are support beams of the existing wall. Trim and shelf in the window area shall match the selected kitchen colors and materials. Bidders shall be required to visit the facility to view the area, examine electrical and plumbing requirements, and take measurements to ensure their ability to provide an accurate quote. A rough draft drawing and some preliminary measurements are attached for reference only and do not represent the specific requirements of this project. Each bidder is requested to provide their own mock-up of the remodel project. OPTIONAL: Please provide quotes for the following options: Hardware: New Hardware for cabinet doors and drawers, consistent with the "retro" feel of the current cabinetry, if hardware needs to be replaced. Electrical and Plumbing: Any electrical outlets shall be inspected and upgraded to code, including switched to GFCI, if needed, and new cover plates installed. Consider electrical and plumbing labor costs if bidder does the work vs. state hospital employees doing the work. Heater removal. Heater unit may need to be removed and disposed of. This option must be discussed with the PSH facility director. If removal is not possible, a decorative finish should be quoted. If it is decided that removal is possible, labor costs for removal and disposal shall be quoted.

Post-Bid

Medical

$75,000.00

Public - State/Provincial

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
27
Bidding Soon
306
All Active Projects
136
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

2601 Gabriel Ave, Parsons, KS


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.