Site work for a water / sewer project in East Palo Alto, California. Working plans call for site work for a water / sewer project.

***As of May 10, 2024. Bid has been cancelled. rebid date not available at this time. Questions Due Date: Apr 10th 2024, 2:00 PM PDT The Association of Bay Area Governments (ABAG) is soliciting bids for the construction of the Palo Alto Horizontal Levee Project. The Association of Bay Area Governments (ABAG) San Francisco Estuary Partnership (SFEP) in cooperation with the City of Palo Alto (City) will be seeking bids for the construction of the Palo Alto Horizontal Levee Pilot Project (PAHLP) proposes to construct a horizontal levee and irrigated ecotone at a site in the City. The Project site is directly adjacent to the City's Regional Water Quality Control Plant ("RWQCP") and Byxbee Park. The Project location is also adjacent to the existing Harbor Marsh, an approximately 90-acre tidal saltmarsh that was established within the former Palo Alto Yacht Harbor. The Project site is bounded by Harbor Marsh to the east, Embarcadero Road to the north, the RWQCP and Harbor Road to the west, and the Byxbee Park parking lot entrance to the south. The project involves constructing a levee berm, installing a new pump at the RWQCP, installation of a buried pipeline (effluent line) along Harbor Road and Embarcadero Road, and routing treated effluent to a new horizontal levee adjacent to Harbor Marsh. Bid opening is open to the public and will be conducted as a Zoom Meeting: Dial by your location o +1 669 900 6833 US (San Jose) o +1 408 638 0968 US (San Jose) PLEASE TAKE NOTICE that this procurement has been cancelled. o +1 669 444 9171 US o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 646 876 9923 US (New York) o +1 646 931 3860 US o +1 689 278 1000 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o 888 788 0099 US Toll-free o 833 548 0276 US Toll-free o 833 548 0282 US Toll-free o 877 853 5247 US Toll-free The scope of work includes, but is not limited to: o Mobilization, including site access, establishment of staging areas and temporary construction facilities and controls o Development and implementation of a Traffic Control Plan o Supplemental erosion control measures and SWPPP compliance o Environmental protection, including compliance with all permit conditions including removal of surface vegetation and installation of wildlife exclusion fencing o Demolition and removal of all items slated for removal as noted on the Drawings and listed in these Technical Specifications o Installation of a new Renzel Marsh pump and associated piping valves, flow meters, other appurtenances, mechanical equipment, and associated electrical work. o Installation of new horizontal levee supply effluent pipeline and associated valves, flow meters, and other appurtenances o Programming of the City's RWQCP programmable logic controller (PLC) and supervisory control and data acquisition system (SCADA) to control delivery of treated wastewater to the horizontal levee o Earthwork and topsoil salvage to construct new horizontal levee, including levee berm, treatment zone, ecotone slope, and stormwater swale o Installation of precast concrete valve vaults, flow meters and valves, infiltration chambers and piping along horizontal levee treatment zone o Installation of storm drain culvert pipe, pile pipe supports and appurtenances, end sections, and flap gate o Right of way paving associated with installation of horizontal levee supply effluent pipeline o Installation of public access trail surfacing, fencing and signage o Installation of erosion control fabric and seeding of levee berm side slopes

Final Planning

Water / Sewer

$3,068,951.00

Public - State/Provincial

Site Work

49

37

4

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
77
Bidding Soon
1,542
All Active Projects
668
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

November 25, 2024

img_map_placeholder

2501 Embarcadero Way, East Palo Alto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.