BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2024 at 8:00 PM

Updated May 18, 2024

Renovation of an educational facility in Sparks, Nevada. Completed plans call for the renovation of a educational facility.

Remove and replace bleachers and wood flooring system and graphics in the Large Gym. Work to include additional electrical and concrete flatwork as drawn and specified. There is an Alternate #1 to replace wood flooring system in Small Gym. Work to include adding an additional exterior door on the South wall as drawn and specified. Liquidity Damages: Contractor must agree that Owner may retain from the monies due the Contractor Two Thousand Five Hundred Dollars ($2,500) per day (Liquidated Damages) as a direct result of the Contractor's delay or for not completing the project in the required time allowance plus approved time extensions.If the Contractor fails to complete or correct the work listed on the comprehensive list of deficiencies ("Punch-List") within the specified time for performance, the Contractor does hereby agree to pay the Owner $500 as Liquidated Damages for each calendar day that the completion or correction of the work extends beyond the 45 days for performance allowed from the date the Contractor receives the Punch List of deficiencies from the Architect and/or his/her consultants and/or the Owner. Question Deadline: Tue 04/16/2024 4:30 PM The physical work is to be commenced upon issuance of a "Notice to Proceed" and as phased in the Special Notifications with an overall completion date on or before January 6, 2025. Bond Notes: Each individual bid shall be accompanied by a surety company issued Bid Bond or by a Certified or Cashier's Check made payable to the Washoe County School District, in the amount of not less than five percent (5%) of the bid, said amount to be forfeited to WCSD, should the Contractor to whom the Contract is awarded fail to enter into the Contract in accordance with the Contractor's bid and any other contract documents and furnish the required bonds within ten (10) days after the delivery of notice of such award. Bid Bonds, upon request, or deposits of the unsuccessful bidders will be returned upon signing of Contract, or within forty-five (45) days from bid date, whichever is earlier. Owner Rights: The right is reserved by WCSD to reject any and all bids or accept the bid, which is deemed by WCSD to be in the best interest of the school district. WCSD also reserves the right to waive any irregularities and/or informalities in the submitted bids. Range Low $1,324,800.00 High $1,619,200.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$1,246,337.00

Public - County

Renovation

16

19

10

8

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
32
Bidding Soon
332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

May 24, 2024

Project location map

1350 Baring Blvd, Sparks, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.