BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Bushnell, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Project scope is intended to provide interim operational improvements for the I-75 corridor. The improvements include construction of auxiliary lanes between interchanges for a 22.5-mile segment of I75 from south of S.R. 44 to S.R. 200, including. More specifically, the Project would involve the addition of one 12-foot auxiliary lane (additional lane between interchanges) to the outside of the general-purpose lanes in each direction and widening of mainline bridges. The auxiliary lanes would not impact the existing interchange bridges. Additional improvements at interchange locations may be required, subject to environmental commitments and local agreements that will be finalized during the Planning Phase 7/22/2024 Anticipated Award Date Question Deadline 04/19/2024 Last day for Proposers to submit questions/clarification. Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Selection Method : Phased Design Build Response Requested : Letters of Response Project Description : I-75 Improvements from South of S.R. 44 to S.R. 200 The Project Scope is intended to provide interim operational improvements for the I-75 corridor. The improvements include construction of auxiliary lanes between interchanges for a 22.5-mile segment of I-75 from south of S.R. 44 to S.R. 200, including. More specifically, the Project would involve the addition of one 12-foot auxiliary lane (additional lane between interchanges) to the outside of the general-purpose lanes in each direction and replacement of mainline bridges. Advertisement Date: 03/28/2024 LOR Response Deadline: 04/29/2024 Time 5:00pm Qualified Firms Selection Committee Meeting: 05/06/2024 Time: 9:30am Qualified and Responsive Firms Posting Date: 05/06/2024 Oral Presentation: 05/28/2024 Final Selection Meeting Date: 06/20/2024 Time: 9:30am Evaluation Scores and Selection Posting: 06/20/2024 FDOT - RFQ D/B - I-75 Improvements from South of S.R. 44 to S.R. 200

Post-Bid

Roads / Highways

$13,460,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
72
Bidding Soon
1,342
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

December 30, 2024

img_map_placeholder

I-75, Bushnell, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.