BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Renovation of a mixed-use development in Amarillo, Texas. Completed plans call for the renovation of a medical facility.

504-21-700 Work includes general construction, alterations, roads, walks, grading, drainage, and necessary removal of existing structures and construction and certain other items to complete the Amarillo EHRM Infrastructure Upgrades project. The contractor shall complete the entire project no later than 548 calendar days after the issuance of the notice to proceed. Work includes complete construction and activation of a new Electronic Health Record Modernization system. The scope of this project is to replace the campus main computer room, upgrade and replace telecommunications closets, and upgrade campus fiber and data cable. Project Building locations include 1, 4, 7, 6/8, 9, 10, 11, 12, 13, 14, 26, 28, 29, 33, 34, 35, 36, 44, 45, 46, 48, 49, 53, 54 and the site. The project includes, but is not limited to, the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, construct exterior shell space to existing buildings for new telecommunication rooms (site work, demolition, shell space, finishes, plumbing, lighting), physical security upgrades, construct diversified path for WAN, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. The period of performance shall be 548 calendar days from issuance of the Notice to Proceed. In accordance with 38 U.S.C. 8127 (Public Law 109-461), this procurement is set aside for SDVOSBs in a trade off evaluation approach. The contractor shall provide all tools, equipment, materials, labor, supervision, and personnel, and shall do all things necessary, that will result in the completion of the EHRM Infrastructure Upgrades construction project, in accordance with the attached Specifications and Drawings. This project is located at: Amarillo VA Medical Center 6010 Amarillo Blvd W Amarillo, TX 79106 VAAR Magnitude of Construction: $20,000,000 to $50,000,000 NAICS Code 236220 and PSC Z2DA. Contractor is required to fill in Unique Identifier in Block No. 14 on Standard Form (SF) 1442. All references in the Specs and Drawings to CLIN shall be replaced with the term "Line Item". PLEASE NOTE: The Contractor agrees to attend any Post AwardConference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 01/20/2025 at 1:00 PM CT

Post-Bid

Medical

$50,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

42

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
4
Bidding Soon
156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.